Laserfiche WebLink
Chairman Scurlock opened the Public Hearing and asked if <br />anyone wished to be heard in this matter. There being none, the <br />Chairman declared the Public Hearing closed. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />- Commissioner Wheeler, the Board unanimously adopted <br />the preliminary assessment roll for sewer improvements <br />in Anglers Cove Subdivision. <br />Seminole Shores and St. Christopher Harbor Wastewater Assessment <br />Director Barton advised that the following assessment costs <br />for this project have been revised to reflect that Lots 8 and 9 <br />in Seminole Shores were combined into one building site: <br />SEMINOLE SHORES <br />ST. CHRISTOPHER HARBOR <br />CONTRACT C-110 SEC. "D" <br />WASTEWATER ASSESSMENT ROLL <br />Construction $71,425.00 <br />Engineering 10.9% $ 7,785.33 <br />Assessment Roll $ 400.00 <br />Field Inspection 4.0% $ 2,857.00 <br />Field Staking & Testing 2.5% $ 1,785.63 <br />Contingencies 10% $ 7,142.50 <br />TOTAL: $91,395.46 <br />Assessment/Lot <br />(Based on 35 Lot Connections) $ 2,611.30 <br />Credit/Lot on 8" F.M. oversize <br />in lieu of 4" F.M. oversize <br />to The Moorings discharge.__ (109.03) <br />Charge/Lot for oversize F.M. <br />to Vero Beach 190.00 <br />TOTAL ASSESSMENT PER LOT: $ 2,692.27 <br />33 <br />FEB 1 `� 1 goo 67 rn� 274 <br />