My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/24/1987
CBCC
>
Meetings
>
1980's
>
1987
>
3/24/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:17 AM
Creation date
6/12/2015 1:48:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/24/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(AR 2 4198% BOOK 6 7 F-a;E 748 <br />ALTERNATIVES AND ANALYSIS <br />The proposed plan necessitates acquisition of a 40 acre tract in the Oslo <br />Road area. The park will serve regional needs, and is planned to be phased <br />as funding becomes available. Phase I construction is estimated to cost <br />$ 1,906,800. <br />Staff is ordering an independent appraisal for the 40 acre tract. A staff <br />appraisal was performed, but the value is not acceptable to the owner. <br />RECOMMENDATION AND FUNDING <br />Staff recommends approval of the Master Plan and authorization to issue <br />final payment in the amount of $7,665 (total contract $10,027) for services <br />rendered. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bowman, the Board unanimously <br />approved the Master Plan and authorized the <br />final payment in the amount of $7,665 for services <br />rendered, as recommended by staff. <br />INDIAN RIVER BOULEVARD SOUTHERLY EXTENSION_- CHANGE ORDER #3 <br />The Board reviewed the following memo dated 3117/87: <br />TO: The Honorable Members of the DATE: March 17, 1987 FILE: • <br />Board of County Commissioners <br />THROUGH: <br />Charles P. Balczun, <br />County Administrator SUBJECT: <br />Indian River Boulevard South <br />Extension - Change Order #3 <br />FROM:James w. Davis, P.E. REFERENCES: <br />Public Works Director3? <br />DESCRIPTION AND CONDITIONS <br />The attached Change Order # 3 has been prepared to add a 48" concrete <br />drainage pipe at the 16th Street canal alongside a 12' x 4' concrete box <br />culvert. The original design specified a 12' x 5' box culvert, however, <br />the Contractor installed his forms one foot too high and poured the <br />concrete floor at the wrong elevation. The 48" pipe will ccnVensate for <br />the contractor error. This item is at no additional cost to the County. <br />Also, <br />2-42" pipes in <br />US 1 right-of-way <br />near 4th Street must be extended 4' <br />each <br />for road safety. <br />This change will <br />increase the contract by $448. <br />
The URL can be used to link to this page
Your browser does not support the video tag.