My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/24/1987
CBCC
>
Meetings
>
1980's
>
1987
>
3/24/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:17 AM
Creation date
6/12/2015 1:48:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/24/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 67 FA�c ��5_ 4 <br />MAS 2 � �9�7 <br />The St. John's River Water Management District has <br />recently studied water supply in this area. <br />3.1.2 The ARCHITECT shall submit to the Owner a further <br />statement of probable Construction cost. <br />3.1.3 The ARCHITECT shall prepare necessary bidding <br />information, forms, General Conditions, and Form <br />of Agreement.- The COUNTY may prefer standard <br />County forms. All permits with conditions will be <br />included in the Contract Documents where feasible. <br />3.2 Bidding and Negotiation Phase <br />3.2.1 The ARCHITECT shall assist the Owner in obtaining <br />bids (all bids submitted Wednesday, 2:00 PM, at <br />County Administration Building). A pre-bid meet- <br />ing, pre -construction meeting, and Utility Co- <br />ordination meeting will be held if necessary. <br />The ARCHITECT will assist in awarding contract and <br />preparing contract for construction. <br />3.3 Construction Phase - Administration of the Contract <br />3.3.1 The ARCHITECT shall provide administration of the <br />_Contract for Construction as set forth in the <br />attached AIA Document B141 Paragraph 1.5 (Exhibit <br />A). The County Parks Superintendent and County <br />Public Works Department will daily monitor the <br />construction and advise the ARCHITECT of compli- <br />ance with the Contract plans, specifications, and <br />requirements. <br />3.3.2 The Contractor shall be required to provide record <br />drawings of the project showing "as -built" con- <br />ditions. Magnetic tape shall be included with <br />underground piping. <br />Section IV - Time for Completion <br />4.1 The basic services exclusive of Contract Administration <br />provided for in this agreement shall be completed within 180 <br />calendar days of the commencement date (as specified in the <br />"Notice -to -Proceed) issued by the County Public Works <br />Director. The parties agree that time is of the essence for <br />completion of the services provided for in this agreement <br />and that the County may, at its option, deduct up to $185 <br />per day for each calendar day that the required services <br />remain uncompleted beyond 180 days of the commencement date. <br />Section V - Compensation <br />5.1 For basic services rendered pursuant to this Supplemental <br />Agreement # 2 and the applicable sections of the Master <br />Agreement, the lump sum fee of $33,400 is established. <br />Section V, Paragraph 2 of the Master Agreement applies. <br />5.2 Monthly payments less 10% retainage shall be permitted based <br />upon percentage of work complete for each phase as follows <br />Design Development and Construction Document Phase 70% <br />Bidding or Negotiation Phase 10% <br />Construction Phase 20% <br />Travel expenses are not reimbursable and are included in the <br />above basic services compensation. <br />5.3 Additional services , additional work, or extra work shall <br />be compensated as specified in the Master Agreement Section <br />V; Paragraph 2, Section VI, or Section VIII. <br />
The URL can be used to link to this page
Your browser does not support the video tag.