My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/7/1987
CBCC
>
Meetings
>
1980's
>
1987
>
4/7/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:18 AM
Creation date
6/4/2015 4:02:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/07/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO -THE HONORABLE MEMBERS OF DATE: March 6, 1987 FILE: <br />THE BOARD OF COUNTY COMMISSIONERS <br />THROUGH: _ <br />Charles P. Balczun <br />Coun Admin'trator <br />SUBJECT: Bid Acceptance-Ercildoune <br />Heights Subdivision Drainage <br />Ralph N. Brescia, P.E. Structures <br />County Engineer <br />FROM: Michelle A. Terry " REFERENCES: <br />Civil Engineer <br />BACKGROUND INFORMATION <br />Property Owners of Ercildoune Heights Subdivision petitioned the <br />County to make paving and drainage improvements to the roads within this <br />subdivision. Drainage structures are required due to the contour of the - <br />land and are required by St. Johns River Water Management District. <br />The Engineering Division prepared plans and specifications for <br />these structures. Plans were made available to all interested <br />contractors in response to our advertisement for bids placed in the <br />Press Journal during the week of February 9, 1987. <br />DESCRIPTION AND CONDITIONS <br />Bids were received on February 25, 1987 as follows: <br />Company Base Bid <br />*Mitchell Concrete Products <br />Ft. Pierce, Florida $5,285.00 <br />Staff's Engineer estimate for this project is approximately <br />$5,900.00. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends awarding the contract to Mitchell Concrete <br />Products. -- <br />Funds to be appropriated in amount of $5,285.00 to cover the cost <br />of this project. <br />Funding is to be from Petition Paving Account #703-214-541-035.29. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Bowman, the Board unanimously awarded the <br />contract for Ercildoune Heights drainage structures <br />to Mitchell Concrete Products in the amount of <br />$5,285 as recommended by staff. <br />73 <br />BOOK 6 7 F,� G 850J, <br />
The URL can be used to link to this page
Your browser does not support the video tag.