Laserfiche WebLink
BOOK 67 FnuE 785 <br />INDIAN RIVER COUNTY <br />Work Authorization No. 13 for Consulting Services <br />Project No. 13 (County) (Masteller & Moler Associates, Inc.) (WATER) <br />I. PROJECT DESCRIPTION <br />Title: U. S. Highway #1 Potable Water Main from 10th Street to South Relief Canal <br />Consulting engineering services relative to design services for construction of <br />approximately 5500 linear feet of 12" diameter water main along U. S. Highway #1 <br />from 10th Street to the South Relief Canal. The project will also include con- <br />struction of fire hydrants, valves, laterals and appurtenances. Construction <br />cost estimate for the project, including 10% contingency is $235,000.00. <br />Service includes eighty (80) hours of "General Services During Constructin" per <br />"Agreement" Article 5, Paragraph 5a. and 5b. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Agreement for Professional Services" dated'July 2, 1986 <br />and specific Article numbers and paragraph numbers which are listed hereinafter <br />to describe the scope of services included on this project: <br />A. Project Design Services per Article 4, Paragraph 4a. and 4b. <br />B. General Services During Construction per Article 5, Paragraph 5a. and 5b. <br />Please note that eighty (80) hours bf these services are included in the <br />lump sum fee in "D" below. <br />C. Supplementary and Special Services Per Article 6, Paragraph 6c., 6d., 6e., 6f., <br />and 6g. In addition, our services shall include field surveys necessary for design <br />and preparation of construction plans and assistance to the County in obtaining <br />various permits and approvals for construction (permit fees to be paid by the County). <br />D. Payment for Services per Article 8, the lump sum fee for Article 4, Paragraph 4a. <br />and 4b. and Article 5, Paragraph 5a. and 5b. above is $ 21,060.00 Payment <br />shall be per Article 8, Paragraph 8b. and 8d. Included in the $ 21,060.00 lump <br />sum fee is $ 3,200.00 for eighty (80) hours for periodic inspection services. <br />Any additional inspection services in excess of the eighty (80) hours will be in- <br />voiced as additional services at the hourly rate of $40.00. Payment for Article 6, <br />Paragraph 6c., 6d., 6e., 6f., and 6g. shall be per Article 8, Paragraph 8a(1). <br />APPROVED BY: <br />INDIAN RIVER COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />B;y 2)m <br />Don C. Scurlock, Jr. <br />Chairman <br />Date d, t 0! <br />` <br />SUBMITTED BY: <br />MASTELLER & MOLER ASSOCIATES, INC. <br />By <br />Earl H. Masteller, P.E. <br />President <br />Date _31 �, 1 FS -7 <br />A6MhlrsVjib Ah " FaORM AND LHOAL SUP'P'ICTLNCY: <br />PAZ LEZti� <br />Char es itunac, County Attorney <br />8 <br />