Laserfiche WebLink
TO: BOARD OF COUNTY COMMISSIONERS <br />THRU: CHARLES P. BALCZUN <br />COUNTY ADMINISTRATOR <br />VIA: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY S tCES <br />L_J <br />DATE: MARCH 23, 1987 <br />FROM: JEFFREY K. BARTON <br />ASSISTANT DIRECTOR OF UTILITY SERVICES <br />(-2zf <br />SUBJECT: WORK AUTHORIZATION #13 <br />U.S. #1 POTABLE WATER MAIN 10TH STREET TO SOUTH RELIEF CANAL <br />BACKGROUND <br />The master plans by.Boyle Engineering recommends that a water line be <br />built on the west side of U. S. #1. The enclosed work order is to <br />build part of that 12" water line which should be done as an <br />assessment project. Along with the Work Authorization is the cost <br />estimate for the construction of the approximately 5,500 feet of 12" <br />line along U. S. #1. <br />RECOMMENDATION <br />The Division of Utility Services staff recommends that the Board of <br />County Commissioners.authorize the Chairman to sign Work Authorization <br />#13 for the U. S. #1. Potable Water Main and for the preparation of an <br />assessment roll to pay for the project. <br />ON MOTION by Commissioner Bird, SECONDED by Com- <br />missioner Eggert, the Board unanimously approved <br />Work Authorization #13 with Masteller & Moler for <br />engineering services for the U.S.#1 Potable Water <br />Main and authorized preparation of an assessment <br />roll for,said project. <br />7 <br />APR 7 19a7L___ <br />BOOK D 4 Ft1Gr 7(1 <br />