My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/28/1987
CBCC
>
Meetings
>
1980's
>
1987
>
4/28/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:18 AM
Creation date
6/12/2015 1:33:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/28/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
View images
View plain text
BOOK 68 PAGE 173 <br />I am making the following recommendations: <br />1. Allow the four April positions to be made available <br />immediately <br />2. Create six Phase I positions for inside security <br />Officers <br />3. Create two Phase I positions for visitation/outside <br />guarding details <br />4. Be prepared to hire three Control Room operators. <br />This single post is now being staffed by two posi- <br />tions. I have not been able to determine if this <br />situation is caused by overcrowding. <br />5. Immediately begin the construction process for Phase <br />III. It would appear that this facility will need <br />to be for Maximum/Medimum custody prisoners <br />6. Hire the consultants for planning the.expansions of <br />food service, medical services, and booking area. <br />The above listed facilities are too small now or <br />will soon be inadequate. <br />,f <br />Respectfully submitted, <br />Capt. Bill Baird, Administrator <br />Indian River County Jail <br />4j� .f <br />P.O. BOX 606 <br />PHONE 5696700 <br />I <br />April 9, 1987 <br />R.T. "Tim" Dobeck, Sheriff <br />P. O. Box 608 <br />Vero Beach, Florida 32960 <br />R.T. "TIM" DOSECK o INDIAN RIVER COUNTY <br />MEMBER FLORIDA SHERIFFS ASSOCIATION <br />MEMBER OF NATIONAL SHERIFFS ASSOCIATION <br />VERO BFACH, FLORIDA 32961.0608 <br />RE: 11 additional positions for <br />Phase I <br />Dear Tim: <br />We are currently operating Phase I with a total of <br />39 staff plus 11 certified Phase II officers and supplement- <br />ing these positions with the non -certified Phase II staff. <br />For approximately 3 years the 39 staff level for Phase <br />I has been in question as to whether this is an adequate <br />number of officers to staff Phase I. <br />14 <br />T <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).