My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/28/1987
CBCC
>
Meetings
>
1980's
>
1987
>
4/28/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:18 AM
Creation date
6/12/2015 1:33:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/28/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cost estimates for the Sheriff's Building. So far, staff feels <br />that we are within budget. <br />Sheriff Tim Dobeck advised that his department provided an <br />itemized list sometime ago, but Commissioner Eggert felt that <br />might have been before the election as she did not remember <br />seeing it. <br />Sheriff Dobeck reported that they are in line with those <br />figures as of last week, and believed the phone bid has been sent <br />out. <br />Commissioner Eggert asked if the phone bid would cover the <br />cost of going into Southern Bell's wires, and Sheriff Dobeck said <br />it would not. He believed they estimated some $60,000 for that <br />substantial cost. They have applied for the 911 interfacing with <br />the other computer systems, but, to his knowledge, therewill not <br />be any extra related costs. <br />Director Baird pointed out that there will be two separate <br />telephone costs for the building, one for the Sheriff's <br />operation, and one for the 911 Center, which means there will be <br />two bids coming in. <br />Commissioner Eggert was still concerned about the cost of <br />using Southern Bell's wires, and Mr. Dean assured her that this <br />cost was covered in the original budget. The cover letter for <br />each cost item that is brought to the Board for approval includes <br />whether or not it was covered in the budget, and this cost was. <br />Commissioner Eggert requested a copy of the figures given to <br />the Board before she came on board last November, and Director <br />Baird advised he would get that information to her. According to <br />the Architect, we have taken under consideration all the conduits <br />for the telephone system and the 911 Center at this time, but he <br />would go back and check on the charges for going into Southern <br />Bell's lines. <br />9 s*j <br />APR . 00 ISU BOOK <br />