Laserfiche WebLink
MAY 19 1987 <br />BOOR 68 FV,F.331 <br />Commissioner Eggert noted that we had reached an agreement <br />with the Sheriff's office that OMB Director Baird was going to <br />check through on all of these, and she was wondering if he had <br />seen this and okayed it. <br />Director Baird advised that Mr. Dean has discussed this with <br />him; he had no problem with it; and we have sufficient funds in <br />the contingency account to cover it. <br />Manager Dean assured the Board that this is a necessity. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Wheeler, the Board unanimously approved <br />Change Order 3, IRC Jail Phase II with Schopke <br />Constr. & Eng. in the amount of $4,788.16 as <br />recommended by staff. <br />ARCHITlCTS OWNER <br />ORDER j 4` ARCHITECT <br />' ., a `•;'w -.' CONTRACTOR <br />• <br />r• , 4' • FIELD <br />OTHER <br />PROJECT: Indian River County Jail <br />(name,. address) Phase 1I <br />OWNER: Board of County Commissioners <br />Indian River County <br />TO: (Contractor) <br />r <br />Schopke Construction and <br />Engineering,. Inc. <br />1620 Tangerine Street <br />Melbourne, Florida 32901 <br />J <br />CHANGE ORDER NO: Three (3) <br />DATE: April 29, 1987 <br />ARCHITECT'S PROJECT NO: 1878 <br />CONTRACT FOR: General Construction <br />CONTRACT DATED: May 28, 1986 <br />YOU ARE .,HEREBY AUTHORIZED TO MAKE THE FOLLOWING CHANGES IN THE SUBJECT JOB: ADD DEDUCT <br />v a a <br />. Revise location of Siamese connection as <br />,required by Indian River County Fire <br />[_;.- Department. Provide connection in north- <br />- ! east courtyard between Phase I and Phase II <br />construction. 1 $4,788.1 <br />TOTAL x 4, 7 8 8.1: s <br />The Contract Time will bslIf Girsgle (unchanged) by ( 0 ) Days, <br />The Date of Substantial Completion as at the date of this Changs Order therefore is <br />14 <br />1 <br />