My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/16/1987
CBCC
>
Meetings
>
1980's
>
1987
>
6/16/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:38:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/16/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 16 1987 BOOK 68 r,A.,U-L 588 <br />DISCUSSION AS TO REROUTING OF TRAFFIC WHEN BRIDGE IS REPLACED IN <br />COUNTRY_ CLUB_ POINTE <br />Commissioner Bird noted that it has come to his attention <br />that we are getting ready to start replacement of the bridge in <br />the Country Club Pointe area, and he is concerned about rerouting <br />of the traffic for both the people using the country club and <br />those residing in Country Club Pointe. He believed the construc- <br />tion will take 60 to 90 days. <br />Vice Chairman Bowman stated that she would like to see a <br />temporary light there, and Commissioner Bird brought up the <br />possibility of a temporary bridge. <br />Traffic Engineer Michael Orr had no definite answer for the <br />problem today, but did believe the cost to rent a bridge for a <br />few months would be pretty high, and the DOT says it is not their <br />practice to install temporary lights unless there is enough <br />volume to warrant the signal. He noted that even if they did <br />agree, it would take three to six months for engineering and <br />construction and it would cost about $30,000 to install. From <br />what he heard, the starting date for the construction is July <br />15th. <br />Commissioner Eggert commented that with the construction on <br />U.S. 1, the emergency vehicles have been using a back road to get <br />over to the hospital, and that would give people a way to get <br />around to 37th Street and get to a light. <br />Commissioner Bird believed we are really creating a <br />hazardous situation for those people going out to U.S.I and <br />crossing the northbound traffic to go south. <br />Engineer Orr advised that they are thinking of routing the. <br />westbound traffic up to 31st Street on the north side of Marvin <br />Gardens. They will have to work with the City on this as these <br />are City streets. <br />Commissioner Bird stated that he would like to have staff <br />request the DOT in'writing for installation of.a temporary <br />traffic signal if it can be done in conjunction in the project. <br />46 <br />L_ <br />_J <br />
The URL can be used to link to this page
Your browser does not support the video tag.