My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/23/1987
CBCC
>
Meetings
>
1980's
>
1987
>
6/23/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:39:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/23/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Chairman 23rY!reupon declared the resolution duly passed <br />and adopted this day of June , 1987. <br />BOARD OF COUNTY COMMISSIONERS <br />OF INDIAN RIVER COUNTY, FLORIDA <br />BY: / G <br />Don C. Scurlock, Jr , hairman <br />Board of County Co 'ssioners <br />PROPOSED WIDENING OF CR 512 WEST OF U.S.I <br />The Board reviewed memo of Public Works Director Davis: <br />TO: The Honorable Members of the <br />Board of County commissioners <br />THROUGH: <br />Charles P. Balczun, <br />County Administrator <br />DATE: June 4, 1987 - FILE: <br />SUBJECT: County Road 512 West of US 1 - <br />Widening and Corridor. Improvements <br />FROM:REFERENCES: <br />. <br />James W. Davis, P.E <br />Public Works Director <br />DESCRIPTION AND CONDITIONS <br />The City of Sebastian Planning and Zoning Commission, the North Indian <br />River County Businessmen's Assoc. Inc., and Dr. Henry Fischer have written <br />correspondence requesting Indian River County to not utilize the Gulf and <br />Western Railroad right-of-way (12.9 acres) when expanding the CR512 roadway <br />corridor between a point 4,500' west of US1 and the US Highway 1 right-of- <br />way. At the present time, there is between 66' and 100' of right-of-way <br />along the existing CR512 road. This existing right-of-way is not suffi- <br />cient for future widening to at least six lanes and. probably eight lanes as <br />Sebastian develops. <br />Staff has proposed an alternative to split the eastbound lanes and west- <br />bound lanes thereby creating a twin -pairs road design which would utilize <br />the existing right-of-way for eastbound traffic and the railroad right-of- <br />way <br />ightof- <br />way for westbound traffic. This design would reduce right-of-way needs and <br />result in a substantial cost savings. <br />Staff recently contacted property owners who own the land between the <br />railroad right-of-way and existing CR512 to determine if they would be <br />willing to trade CR512 frontage for railroad right-of-way frontage. The <br />property owners were not receptive to this request. <br />The City of Sebastian Planning and Zoning Commission recently approved a <br />site plan which fronts on CR512 that includes parking lots, drainage <br />facilities, and wells within the 120' wide County Thoroughfare Plan right- <br />of-way for CR512. The buildings and parking lots are being presently <br />constructed, and recently a County. right-of-way permit was applied for to <br />connect a driveway to CR512 from this site plan (Mr. Philipson and Mr. <br />Preuss) . Staff informed the developer that 27' of right-of-way is neces- <br />sary to widen CR512. This issue is presently being resolved pending <br />right-of-way permit issuance. <br />60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.