Laserfiche WebLink
WL 1I <br />BOOK / 'rQ <br />water. Ultimately, under the long-range master plan, this line <br />will continue through Grand Harbor and then take Indian River <br />Boulevard back south all the way through the City of Vero Beach <br />and come out on U.S. #1, which will be a total loop to the <br />system. Under the second phase, 58th Avenue will continue to run <br />north to the new water plant when it is built, and everything <br />will be inter -connected. Director Pinto felt it is a very good <br />plan and asked for the Board's approval today to design and bid <br />Phase I and approval for just the designing of Phase 11. The <br />bidding for Phase II construction will come back to the Board <br />depending on how Phase I goes. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />Work Authorization #14 with Masteller & Moiler for the <br />design of Phase I and Phase ll, as outlined in the <br />above memo, and authorized staff to prepare documents <br />to receive bids for Phase I the project, as recommended <br />Director Pinto. <br />EXHIBIT FOR WORK AUTHORIZATION •14 <br />100 t.AT10 C010OLTINO 110TI611 <br />H11ASTRLON i MOM" Ag130ClATe6. INC. <br />WI ea•rll.ouorm•wwewr.Iq <br />54 <br />• �. <br />`i •• ' 1 <br />• <br />w �t <br />' <br />1 <br />v c.�. .r <br />-PHASE U- 8-111 <br />t� �,_ a •1 <br />HE G-110 <br />^ <br />..Tu•.AIN \ <br />• 1d <br />' <br />_ <br />q♦ Dom'♦ <br />AS%�I!• <br />R.. <br />�•, .. <br />EXHIBIT FOR WORK AUTHORIZATION •14 <br />100 t.AT10 C010OLTINO 110TI611 <br />H11ASTRLON i MOM" Ag130ClATe6. INC. <br />WI ea•rll.ouorm•wwewr.Iq <br />54 <br />