Laserfiche WebLink
Consulting engineering design services relative to construction of <br />approximately 26,000 linear feet of 20" diameter water main from Kings <br />Highway and Route #60, north along Kings Highway to Lindsey Road and east <br />along Lindsey Road from Kings Highway to 28th Court. Project shall also <br />include construction of 4,750 linear feet of 16" diameter water main.from <br />Kings Highway east along South Gifford Road for connection to the <br />existing 8" diameter line west of 43rd Avenue and 1,850 linear feet of <br />12" diameter water main from Lindsey Road south along 43rd Avenue for <br />connection to the existing 6" diameter water main termination. The <br />project will include construction of fire hydrants, valves, canal <br />crossings and appurtenances. Construction cost estimate for the project, <br />including 10% contingency, is 51,316,000.00. _ <br />B. PHASE II <br />Title: 20" Diameter Potable Water main on Kings Highway north of <br />Lindsey Road to South Winter Beach Road. <br />Consulting engineering design services relative to construction of <br />approximately 13,700 linear feet of 20" diameter water main from Kings <br />Highway and Lindsey Road north along Kings Highway to the intersection of <br />South Winter Beach Road. The project will also include construction of <br />fire hydrants,' valves, canal crossings and appurtenances. Construction <br />cost estimate for the project, including 10% contingency, is $563,600.00. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Agreement for Professional Services" dated July <br />2, 1986, and specific Article numbers and paragraph numbers which are <br />listed hereunder to describe the scope of services included on this <br />project. <br />A. Project Design Services per Article 4, Paragraph 4a. and 4b. <br />B. General Services During Construction per Article 5, Paragraph Sa. and <br />5b. <br />C. Supplementary and Soecial Services per Article 6, Paragraph <br />6c.,6d.,6e.,6f., and 6g. In addition, our services shall include field <br />surveys necessary for design and preparation of construction plans and <br />assistance to the County in obtaining verious permits and approvals for <br />construction (permit fees to be paid by the County). <br />BOOK G i*i- 140- <br />INDIAN RIVER <br />COUNTY <br />C.. <br />Date: June <br />9, 1987 Work <br />Authorization <br />No. 14 for Consulting Services <br />Project No. <br />14 County). <br />(Masteller <br />& Moler Associates, Inc.)(WATER)- <br />I. PROJECT <br />DESCRIPTION <br />A. PHASE I <br />Title: 20". <br />Diameter Potable <br />Water,Main on Kings Highway, Lindsey Road, <br />S. Gifford <br />Road and 43rd <br />Avenue. <br />Consulting engineering design services relative to construction of <br />approximately 26,000 linear feet of 20" diameter water main from Kings <br />Highway and Route #60, north along Kings Highway to Lindsey Road and east <br />along Lindsey Road from Kings Highway to 28th Court. Project shall also <br />include construction of 4,750 linear feet of 16" diameter water main.from <br />Kings Highway east along South Gifford Road for connection to the <br />existing 8" diameter line west of 43rd Avenue and 1,850 linear feet of <br />12" diameter water main from Lindsey Road south along 43rd Avenue for <br />connection to the existing 6" diameter water main termination. The <br />project will include construction of fire hydrants, valves, canal <br />crossings and appurtenances. Construction cost estimate for the project, <br />including 10% contingency, is 51,316,000.00. _ <br />B. PHASE II <br />Title: 20" Diameter Potable Water main on Kings Highway north of <br />Lindsey Road to South Winter Beach Road. <br />Consulting engineering design services relative to construction of <br />approximately 13,700 linear feet of 20" diameter water main from Kings <br />Highway and Lindsey Road north along Kings Highway to the intersection of <br />South Winter Beach Road. The project will also include construction of <br />fire hydrants,' valves, canal crossings and appurtenances. Construction <br />cost estimate for the project, including 10% contingency, is $563,600.00. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Agreement for Professional Services" dated July <br />2, 1986, and specific Article numbers and paragraph numbers which are <br />listed hereunder to describe the scope of services included on this <br />project. <br />A. Project Design Services per Article 4, Paragraph 4a. and 4b. <br />B. General Services During Construction per Article 5, Paragraph Sa. and <br />5b. <br />C. Supplementary and Soecial Services per Article 6, Paragraph <br />6c.,6d.,6e.,6f., and 6g. In addition, our services shall include field <br />surveys necessary for design and preparation of construction plans and <br />assistance to the County in obtaining verious permits and approvals for <br />construction (permit fees to be paid by the County). <br />BOOK G i*i- 140- <br />