My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/14/1987
CBCC
>
Meetings
>
1980's
>
1987
>
7/14/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 2:29:24 PM
Creation date
6/12/2015 1:42:58 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/14/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JJU L 14'667 <br />BOU 8 rvUE 774 <br />Donald Clett, 13th PI. SW, wished to have their street paved <br />also, but wondered how long it would take. <br />Director Davis stated that road is included, and anticipated <br />the paving would probably be within 18 months. They can't <br />schedule it completely; they have done the surveying work, but <br />the engineering work has not been completed. <br />Chairman Scurlock asked if there was the possibility that we <br />could consider contracting this work out because he believed the <br />people want this expedited as fast as possible. <br />Director Davis agreed contracting out was a possibility. <br />A resident of the area had a question about how much each <br />would have to pay, and the Chairman and Commissioner Bird <br />explained just how the price is worked out in the final <br />assessment. <br />Arthur Adkins, 1630 3rd Ave. SW, wished it confirmed that <br />3rd Avenue is to be paved in front of his house, and Civil <br />Engineer Michelle Terry confirmed that it would be. <br />Cathleen Brinson, 1666 3rd Ave. SW, expressed concern about <br />the bill having to be settled in two payments, and Chairman <br />Scurlock noted that in the past we have been allowing a 3 year <br />payment schedule, and he hoped the Motion to be made will include <br />allowing a 5 year payment schedule. The interest is 12%. <br />Mrs. Brinson wished to know what roads they might start out <br />with, and Public Works Director Davis advised that they <br />anticipate working from east to west. He would like to do the <br />whole subdivision at once, and they plan on putting possibly two <br />crews in there, but it will take some time. It is the biggest <br />subdivision we have done this way - and it will probably take a <br />year to complete. They will try to segment it. <br />Chairman Scurlock assured those present that we will try to <br />get this paved as soon as possible. <br />It was determined that no one further wished to be heard, <br />and the Chairman declared the public hearing closed. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.