one for possible purchase - another for possible effluent <br />disposal agreement with the owners - but before we can draw any <br />conclusions, we need rather sophisticated hydro -geological <br />studies done. That would be the first Phase of the project, <br />which is $28,000, which would tell us how much, if any, the land <br />can take. In Phase II, if the land can handle that amount of <br />effluent, we would then design a system to distribute the <br />effluent. <br />Commissioner Bowman asked if the study is mostly test <br />boring, and Director Pinto stated it is, and they have to set up <br />some test wells to determine direction -of the underground flow. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Wheeler, the Board unanimously approved <br />Work Authorization #8a with Camp, Dresser & McKee <br />for hydrogeologic study and report services in the <br />amount of $28,000 and Work Authorization #8b, also <br />with Camp, Dresser & McKee for effluent disposal <br />system design in the amount of $49,000. <br />JUL 14- 1987 79 BOOK 68.Ft,cc IPJ <br />