My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/14/1987
CBCC
>
Meetings
>
1980's
>
1987
>
7/14/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 2:29:24 PM
Creation date
6/12/2015 1:42:58 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/14/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
one for possible purchase - another for possible effluent <br />disposal agreement with the owners - but before we can draw any <br />conclusions, we need rather sophisticated hydro -geological <br />studies done. That would be the first Phase of the project, <br />which is $28,000, which would tell us how much, if any, the land <br />can take. In Phase II, if the land can handle that amount of <br />effluent, we would then design a system to distribute the <br />effluent. <br />Commissioner Bowman asked if the study is mostly test <br />boring, and Director Pinto stated it is, and they have to set up <br />some test wells to determine direction -of the underground flow. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Wheeler, the Board unanimously approved <br />Work Authorization #8a with Camp, Dresser & McKee <br />for hydrogeologic study and report services in the <br />amount of $28,000 and Work Authorization #8b, also <br />with Camp, Dresser & McKee for effluent disposal <br />system design in the amount of $49,000. <br />JUL 14- 1987 79 BOOK 68.Ft,cc IPJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.