My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/21/1987
CBCC
>
Meetings
>
1980's
>
1987
>
7/21/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:43:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/21/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />�JUL 2 11987 Boos b 8 f,A t 846 <br />D. Change Order #3-6 - Sheriff's Administration Building - <br />(tabled at 4/14/87 meeting <br />The Board reviewed the following letter dated 5/22187: <br />SWRh <br />May 22, 1987 <br />Mr. A. Donadio <br />C.E. Block Architect, Inc. <br />P.O. Box 1206 <br />Vero Beach, Florida 32961 <br />PWR CORPORATION <br />HIGHLAND cnY. FLORIDA 33846-6248 <br />Re: Sheriff's Administration Building <br />813/648.1408 . <br />Dear Tony: <br />The cost of -adding conduit, access hand holes and three 3' x <br />3' x 4" concrete pads for the seven monitoring wells indicated <br />as item No. 7 on Dwg. ME -1, is indicated below: (See Attached) <br />Labor & Materials------------------------ $1,487.00 <br />Insurance @ .005 ------------------------ $7.44 <br />Subtotal 94.4 <br />Permit @ .003---------------------------- $4.48 <br />Subtotal $1,498.92 <br />G.C. Overhead & Profit @ 0.10------------ $149.89 <br />Subtotal ,648.81 <br />Bond @ 0.015 ------------- =--------------- $24.73 <br />,6 3. <br />Add Total--- $1,673.00 <br />The above cost is based upon extending the conduit from the (4) <br />wells near service island to the shop building and terminating <br />above the concrete. The conduit at -the three wells south of <br />the shop building will terminate above grade near the three <br />new concrete pads. All seven monitoring wells will:be-. .. <br />equipped with hand holes and covers for visual inspection. <br />Please issue a change order to reflect the $1,673.00• increased <br />cost for this project. <br />Sincerely, <br />PW%R% CORP RATION <br />Richard L. Stratton <br />Executive Vice President <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.