Laserfiche WebLink
Commissioner Eggert recalled that this change order was <br />tabled from last week in order to determine what kind of equip- <br />ment would be needed. She asked if it was wise for us to go <br />ahead and do this in light of what we plan on doing there in the <br />future. <br />Solid Waste Manager Sonny Dean explained that presently we <br />have a manual monitoring system, but the DER has indicated that <br />they are going to an electrical system, which calls for a <br />sensoring device to be dropped down the well with a wire run over <br />to a a location protected from the weather. He recommended that <br />the conduit be installed from the monitoring well over to the <br />Inside of the building. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bowman, the Board unanimously <br />approved Change Order 3-6 in the amount of <br />$1,673 for the Sheriff's Administration <br />Building. <br />/ 4gHANGE Distribution to: <br />ORDER OWNER 0 <br />ARCHITECT O i <br />1 CONTRACTOR O <br />AIA DOCUMENT G70 <br />C FIELD 0 <br />OTHER O <br />f <br />PROJECT: Sheriff's Administration Building CHANGE ORDER NUMBER: I.R.C. 3-6 ip <br />(name, address) <br />INITIATION DATE: 6/17/87 <br />TO (Contractor): <br />F ARCHITECT'S PROJECT NO: 8528 <br />PWR Corporation CONTRACT FOR: One story block office buil <br />P. 0. BOX 249 <br />Highland City, Florida 33846 CONTRACT DATE: October 13, 1986 <br />You are directed to make the following changes in this Contract: s <br />Add conduit, access hand holes, and Add: $1, 673.00 <br />concrete pads for (7) seven monitoring <br />wells indicated as item no.7 on Drawing <br />ME -1, (See attached) <br />,JUL 2 1.1987 5 Booty bb F ,r 47 <br />