My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/4/1987
CBCC
>
Meetings
>
1980's
>
1987
>
8/4/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:51:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/04/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />CHANGE <br />ORDER <br />AIA DOCUMENT G701 <br />Distribution to: <br />OWNER <br />❑ <br />ARCHITECT <br />❑ <br />CONTRACTOR <br />❑ <br />FIELD <br />❑ <br />OTHER <br />❑ <br />BOOK 0 A <br />PROJECT: Sheriff's Administration Building CHANGE ORDER NUMBER: I.R.C. 3-7 <br />(name, address) <br />INITIATION DATE: July 7, 1987 <br />TO (Contractor): <br />ARCHITECT'S PROJECT NO: 8528 <br />PCORPORATION CONTRACT FOR: One story Mock <br />P.O. Box 249 office building <br />Highland City, F1 33846. <br />L J CONTRACT DATE: Qctober. .13 t 1986 <br />You are directed to make the following changes in this Contract: <br />1. Alter retention ponds west of. eyidence storage building (for water run off due <br />to'c0ncrete'slab added to •corifUcAted property compound in change order no. I:R.C. 341 <br />CSee Attached Breakdown). <br />2. Furnish and install additional required <br />front end alignment equipment as authorized <br />by the Sheriff's office.(See attached breakdown) <br />Add; <br />Total add: <br />$4,515.00 <br />$2,321.00 <br />$6,836.00 <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustMent in the Contract Sum or Contract Time. <br />The original (Contract Sum) XW4 was ........................... $ <br />2,1067155 ; •QG <br />Net change by previously authorized Change Orders .:................................. $ <br />411 IP -39 ., 37 <br />The (Contract Sum) 1a�krXt�X�X+K�lc'riiira prior to this Change Order was ...... $ <br />21,517,394.. 37 <br />The (Contract Sum) MMMIUiM9iiAAwili be (increased) (aXe%XMEMM"M94 <br />bythis Change Order .. '..:....:... ....................................................... .$ <br />6 836, 00 <br />, <br />The new (Contract Sum) (#�tialrlLd(t�X&YJ dcMrJIt )MU including this Change Order will be ... $ <br />2, 524, 230 .37 <br />The Contract Time will be (unchanged) by <br />( 0 )'Days. <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />, <br />Authorized: <br />C.E. BLOCK ARCHITECT, INC. PWR CORPORATION. .CHAIRMAN <br />OF I•R.C. COMMISSION <br />ARCHITECT 1995 39th Aye.• • . CONTRACTOR P 0 • BOX Z49 OWNER <br />T <br />Address Address • • -- Add <br />Vero .Beach Fl 329.60. •H' hl nd Cit Fl 33846X <br />,l/rr�•�1-���- <br />BY BY BY <br />-A <br />DATE '7 — -7 DATE DATE <br />/Y2/ <br />AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION AIAe 01978 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 173S NEW YORK AVE., N.W., WASHINGTON, D.C. 2000x. <br />G701-1978 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.