My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/15/1987
CBCC
>
Meetings
>
1980's
>
1987
>
9/15/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2018 9:43:48 AM
Creation date
6/12/2015 1:57:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/15/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41 <br />10 <br />SEP 1510,3 <br />TO: BOARD OF COUNTY COMMISSIONERS <br />THRU:. TERRANCE G. PINTO_ <br />DIRECTOR OF UTIL`I�YIfERVICES <br />FROM: JOHN FREDERICK LANG <br />ENVIRONMENTAL SPECIALIST <br />DIVISION OF UTILITY SERVICES. <br />SUBJECT: GLENDALE LAKES SUBDIVISION <br />47TH AVENUE AND 9TH PLACE <br />WATER SYSTEM IMPROVEMENTS <br />PROJECT NO. UW87-09DS <br />BACKGROUND <br />BOOK 69 PAGE 453 <br />DATE: AUGUST 19, 1987 <br />The Board of County Commissioners in their meeting of May 15th <br />approved the preparation of costs estimates of the proposed water <br />main construction on 47th Avenue and 9th Place. The Department of <br />Utility Services has had engineering plans drawn up by the firm of <br />Masteller and Moler Associates, Inc. <br />Included in the plans were firm cost estimates totaling $40,000.00. <br />The Department of Utility Services wishes to proceed with the <br />project by adoption of this resolution. We are developing <br />preliminary assessment roles and we will bid out construction upon <br />adoption of the attached resolution. Prior to the second public <br />hearing, as specified by Ordinance 81-27, the Department will have <br />an informal meeting with -the property owners regarding their <br />assessments. The Department will come back within 45 days of <br />September 15, 1987 with the results of the bidding process. <br />ANALYSIS <br />Upon completion of the subject project approximately one-third of <br />the residents in the Glendale Lakes Subdivision will be served by <br />the County's water system. The preliminary cost estimate for the <br />entire subdivision's water system improvements is pending, as <br />previously authorized by the Board of County Commissioners on May <br />15, 1987. <br />RECOMMENDATION <br />The Division of Utility Services recommends that the Board of County <br />Commissioners authorize the bidding out of the construction for this <br />project and the informal informational meeting with the property <br />owners, as well as, executeing the attached work authorization No. <br />15 for Engineering Services. <br />Director Pinto advised that this assessment project has been <br />around for some time. There is a request by the residents to be <br />provided with water, and staff would like authorization to get <br />started on the procedure. <br />Chairman Scurlock asked how many customers this would add to <br />our system, and Utility Director Pinto stated that it would be 17 <br />or 18 on this specific project. <br />The Chairman asked if anyone present wished to be heard. <br />There being none, he declared the public hearing closed. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.