My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/22/1987
CBCC
>
Meetings
>
1980's
>
1987
>
9/22/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:20 AM
Creation date
6/12/2015 1:58:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/22/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />- t)i.tnUuU,ut iu <br />ORDER <br />AKIN <br />AIA UO(. UA4f N 1 G701 CON f KA(.10K I J <br />111111) I I - <br />)IIILK 1.1 <br />PROJECT:Ercildoune Heights C1IAN .GL ()KlA.R NUMBER: 2 - <br />*(name, address) Sebastian, FL 32958 INI11Afl()N DATE: September 10, 1987 <br />TO (Contractor): <br />[—Frank Pavlovich, Jr. <br />P.A.V.C.O- Concrete Pumping <br />2680 Rocky Point Drive <br />Palm Bay, FL 32905 <br />L <br />ARCHI f ECT'S PROJECT NO: <br />CONTRACT FOR: Curbing <br />CONT RAC T DA1 E : <br />Yuu are directed to make the following changes n1 this Contra, t. <br />1) Provide drop curb at corner of 81st Avenue and <br />140th Street. Mr. Cave's drive. Cost $ 490.00 <br />Approximately 81 L.F. curb <br />2) Extend curb at corner of 79th Ave and 140th Street <br />Approximately 37 L.F. curb Cost 225.00 <br />3) Catch basins on 141st Street - 2 catch basins with <br />approximately 20 L.F. header curb and 80 to 90 S.F. <br />4" concrete around catch basin. 2 @ $400/each Cost 800.00 <br />4) Mr. Cristiano's drive and 1 catch basin <br />Approximately 55 L.F. header curb <br />Approximately 260 S.F. drive @ 6" thick <br />w/6x6 10x10 wire mesh <br />5) Catch Basin on south side of 140th Street <br />25 L.F. curb header <br />• 140 S.F. 411 thick flatwork around basin <br />TOTAL COST <br />Cost 1,150.00 <br />Cost 475.00 <br />$3,140.00 <br />Note valid until signed by both the ()wner and Architect. <br />Signature rri the Contractor indicates his agreement herewith, including any adlu+tment in the Cnntratt Sum ur Contract Tmu• <br />was $14,816.10 <br />The original (Contract Sum) ( ft ) 2t t ) . ' • • ' ' ' ' ' ' ' ' ' ' • ' ' .. $ <br />Nei ch.,nKe by previously authorized Change Orders ..... • . • • • • • • • • • • • • • .. • .. ' ' " <br />The (Contract Sum) prior t1! thi,, Change Order was .......... $ 9,742.20 <br />The (Contract Sum) (Guaranteed Maximum CUSU will be (increased) 1*x§CXXQb (WXk4QX§4l) $ 3,140.00 <br />by this Change Order .......... <br />The new (Contract Sum) (Guaranteed Maximum Coit) including this Change order will he .. $12,882.2o ) Days. <br />Tl.e Contract Time will be (jMoed) (4k0CWXX t) (unchanged) by <br />The Date (it Substantial Completion as of the date of �s Change (. rilo•r therefore i%tt Authonied: <br />CONMA( tOk Frank Pavlovich oiw^EK Indian River Count <br />.Engineer -Ralph N. Brescia j( �4R )ra ^t -- <br />,t AoArj h Bay, Fla. 32905 Vero Beach, FL 32960 <br />�_-- <br />v.., .. Aca�h PT. 3-2960 -- — — -- ------ <br />IDATt _ <br />l r:S I t <br />AIA DOCUMENT 6701 • CHANGE ()Kock AI'911 14,'11 101111"4 AIA" C701 — 1978 <br />IKE AMERICAN INSTITUTE Of ARp1tlEC15, 17si NEW i(JRK AVE.. N.W.. wASHINUION. <br />33 <br />SEP 2 21987 - Nov , 69 PACE'517 <br />
The URL can be used to link to this page
Your browser does not support the video tag.