My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/22/1987
CBCC
>
Meetings
>
1980's
>
1987
>
9/22/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:20 AM
Creation date
6/12/2015 1:58:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/22/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r- <br />Ep 221987 <br />BOOK 69 PAGE 516 <br />CHANGEi1;tiUu,c;hun lu a <br />ORDER OWN(R I <br />ARC HI lEC1 L`) <br />AIA UC C: Uhfl NT G701 CONTRA( . 10K C.1 <br />IIELD (_► <br />0111ER l_1 <br />PROJECT: Ercildoune Heights CHANCE ORDN NUMBER: 1 <br />(name, address) Sebastian, FL 32958 <br />TO (Contractor): <br />r Mr. Frank Pavlovich, Jr. <br />P.A.V.C.O Concrete Pumping <br />2680 Rocky Point Drive <br />Palm Bay, FL 32905 <br />INITIAfI()N DATE: September 10, 1987 <br />ARCHITECT'S PROJECT NU: <br />CONTRACT FOR: Curbing <br />CONTRACT DATE: <br />You are directed to make the following changes In this Corntra+ t. <br />Eliminate 1301 L.F.•of curbing done by machine from original contract <br />1301 @ $3.90/L.F.=$5,073.90 <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment ,n the Contract Sum or Contract Time. <br />The original (Contract Sum) was ........................... S 14,816.10 . <br />Net change by previously authorized Change Orders ................................... $ <br />The (Contract Sum) prior to this Change Order was .:........ $ 14,816.10 <br />The (Contract Sum) (QMV=429d.'MxRoW will be krxm (decreased) baRob3+Mck 5,073.90 <br />bythis Change Order......................................................... $ <br />The new (Contract Sum) including this Change Order will be ... $ 9,742.20 <br />The Contract Time will be 1 '".,.•„)Kf ===-d i(unchanged) by ! ) Days. <br />The Date of Substantial Completion as of the date of thus Change der there ore i <br />Authorized: <br />Indian River County <br />Engineer -Indian River Countly NTRACIOR FranX Faavlovich OWNER <br />_ �_ Dr.r.lrcr Dint n �_ _1840 25th Street <br />d s AdYQro�`td'�m Bay Fla . Address <br />_ each --B PL Via Bc�ar�h _ FT. 3 <br />00, <br />BY <br />=OATElp �, / escia, P.E. !)ATE RATE 9` OZ�—�� <br />All DOCUMENT 6701 • CHANGE ORUCK APRIL 19711 tUIHON �_A A • 4, ly7q <br />THE AMERICAN INSTITUTE Of ARCHIIECTS, 1735 NEW 1UKK AVE., N.W., WASHINI.t(IN, 1, c . %AAih G701 —1979 <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.