My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/27/1987
CBCC
>
Meetings
>
1980's
>
1987
>
10/27/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:21 AM
Creation date
6/4/2015 4:50:43 PM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCT 2 p <br />BOOK 69 PAryCa <br />GE I ,, <br />TO:THE HONORABLE MEMBERS OF DATE: October 8, 1987 FILE: <br />BOARD OF COUNTY COMMISSIONERS <br />THROUGH: <br />Charles P. Balczun <br />County Admini trator <br />SUBJECT: Change order #3 <br />Ercildoune Heights S/D <br />R ph N. Brescia, P.E. Concrete work -Petition Paving <br />County Engineer <br />FROM: Michelle A. Terr-67tTy CT. REFERENCES: <br />Civil Engineer <br />DESCRIPTION AND CONDITIONS <br />Due to the untimely death of the owner -operator of P.A.V.C.O., <br />Concrete Pumping and Curbing, the county has prepared Change Order #3 <br />eliminating additional concrete work that was required around catch <br />basins and drives. This will reduce the original contract by $3,140.00 <br />resulting in a final contract amount of $9,742.20. <br />The county crews will perform the work, so we may proceed with this <br />project as quickly as possible. <br />RECOMMENDATION & FUNDING <br />It is recomended that Change Order #3 be approved. <br />ON MOTION by Commissioner Eggert, SECONDED by Commis- <br />sioner Bowman, the Board unanimously (4-0) approved <br />Change Order #3 Ercildoune Heights Concrete Work <br />(P.A.V.C.O. Concrete Pumping & Curbing) reducing the <br />original contract by $3,140.00. <br />PROIECT: Ercildoune Heights C11AN(.E MIAR NUMBER 3 <br />(name. address) Sebastian, FL 32958 <br />TO (Contractor): IN171A11ON ELATE October 7, 1987 <br />ARC111ILCI''S 11RO ILCT N(): <br />�P.A:V.C.O. Concrete Pumping <br />(0NTRA(1 FOR: Curbing <br />2680,Rocky Point Drive <br />Palm Bay, FL 32905 <br />L. _J CONTKA(T DATL: <br />Vou are directed to make the following changes in this Coniraf t <br />1). Eliminate drop curb at corner of 81st Avenue and <br />140th Street. Mr: Cave's drive. <br />Approximately 81 L.F. curb Cost $ 490.00 <br />2) Eliminate curb at corner of 79th Ave and 140th Street <br />Approximately 37 L.F. curb Cost 225.00 <br />3) Catch basins on 141st Street - Eliminate 2 catch <br />basins with approx. 20 L.F. header curb & 80 - 90 S.F. <br />4" concrete around catch basin. 2 @ $400/each Cost 800.00 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.