Laserfiche WebLink
4) Eliminate Mr. Cristiano's drive and 1 catch basin <br />Approximately 55 L.F. header curb <br />Approximately 260 S.F. drive @ 6" thick <br />w/6x6 10x10 wire mesh Cost 1,150.00 <br />5) Eliminate catch Basin on south side of 140th Street <br />25 L.F*. curb header <br />140 S.F. 4" thick flatwork around basin Cost 475.00 <br />TOTAL COST 53,140 00 <br />Not valid until signed by both the Owner and Architect. <br />Signature tit the Contractor indicates his agreement herewith, including any adlu.tment in the Contract Sum or Contract Irnu- <br />The original (Contract Sum) was ........................... $14,816.10 <br />Net change by previously authorized Change Orders ................................... $ 3 ,,14 0.00 <br />Tike (Contract Sum) prior to this Change Order was .......... $ 12,882.20 <br />The (Contract Sum) be (M8)}fiit"K <br />by this Chane Order ........................................ ............... $ 3,140.00 <br />The new (Contract Sum) (kXXpritgrA*30ti MRiAiodkncluding this Change Order will he $ 9,742.20 <br />TI.e Contract Time will be 0R"pa od) Jdcwxa4vdJ (unchanged) by ( ) W <br />Thra Date of Substantial Completion as of the date of t`.is Change Order therefore i. <br />Authon/ed: <br />Ral jL N. Rrr.GC1A., P.P.- __P .g.3Lf_.Q - _- --.-- _-Ind i an R i v—er- _Caunty_ <br />i, k Engineer CONrRA( 1014 ()WN[R <br />�t*'eet _ 2b..8D_ R_ y p-aint-.Dr.iv-e-1a4D.25- <br />Address Addre%% Aildrr•+s <br />Vero Beach F 32960 Palm Bad MFL 32905Vero_Beach F 32960 <br />BY <br />tit _C—P.�•t=� - - �J� -- ilv'v-C <br />DAT[ I,AIt <br />K, Ercildoune Heights SID - Curbing -Final Payment <br />The Board reviewed staff memo, as follows: <br />TO THE HONORABLE MEMBERS OF DATE: October 19, 1987 FILE: <br />BOARD OF COUNTY COMMISSIONERS <br />THROUGH: <br />Charles P. Balczun <br />County Administrator <br />--SUBJECT: Curbing in Ercildoune Heights <br />t�Bresc�ia, <br />Subdivision <br />a P.E. <br />County Engineer <br />FROM: Michelle A. Terry C:. E. T.�iEFERENCES: <br />Civil Engineer <br />DESCRIPTION -AND CONDITIONS <br />The construction of the curbing in Ercildoune Heights Subdivision <br />is complete. This project has been inspected and has met the <br />requirements set forth in the contract documents and specifications. <br />RECOMMENDATION & FUNDING <br />It is Staff's recommendation that the final payment of $9,742.20 be <br />paid in full to P.A.V.C.O. Concrete Pumping . The money is available <br />from the Petition Pavina Account #173-214-541-035.31. <br />L_' OCT 2 7 1987 9 BOOK 69 PAGE 182 <br />