My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/1987
CBCC
>
Meetings
>
1980's
>
1987
>
11/3/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:21 AM
Creation date
6/12/2015 1:53:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/03/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Final Plat Approval for Foxridge Subdivision <br />The Board reviewed the following memo dated 10/22/87: <br />TO: The Honorable Members of DATE: October 22, 1987 FELE: <br />the Board of County Commissioners <br />DIVISION HEAD CONCURRENCE: <br />Roert N . Ke t g, P SUBJECT: FINAL PLAT APPROVAL FOR <br />Planning & Deve op nt Director FOXRIDGE SUBDIVISION <br />THOUGH: Stan Boling �} <br />Chief, Current Development <br />e7"A/ <br />FROM! <br />Robert E. Wiegers REFERENCES: foxridge <br />Staff Planner BWIEG2 <br />It is requested that the data herein presented be given formal <br />consideration by the Board of County Commissioners at their <br />regular meeting of November 3, 1987. <br />DESCRIPTION AND CONDITIONS: <br />Fo�ridge is a 40 lot subdivision of a ±10 acre parcel located in <br />the northeast corner of the Timber Ridge PRD project, north of <br />Oslo Road on the east side of the Lateral "J" Canal. The current <br />zoning is RM -6 (Multi -family Residential, up to 6 units/acre) <br />with a land use designation of LD -2 (Low Density Residential, up <br />to 6 units/acre). At their regular meeting of January 6, 1986, <br />the Board of County Commissioners granted conceptual PRD approval <br />for the entire Timber Ridge project, which includes the Foxridge <br />subdivision. <br />On December 11, 1986, The Planning and Zoning Commission granted <br />preliminary PRD approval for Foxridge. Since that time, a land <br />development permit has been issued and all internal required <br />subdivision improvements have been constructed. Pursuant to a <br />condition of preliminary PRD plat approval, provision for <br />construction of a left -turn lane at the Timber Ridge Oslo Road <br />entrance is required. The owner, Andrew Mustapick, is now <br />requesting final plat approval and has submitted: <br />1. a final plat in conformance with the approved preliminary -PRD <br />plat; <br />2. a performance bond for 1150 of the cost of constructing a <br />left -turn lane on Oslo Road at the project entrance (to <br />satisfy the preliminary PRD plat approval condition); <br />3. an approved cost estimate from the project engineer; and <br />4. a contract committing the applicant to complete the left -turn <br />lane improvements. <br />ANALYSIS: <br />All required improvements have been constructed, and have been <br />inspected and approved by Public Works. All requirements for <br />final PRD plat approval have been satisfied. <br />RE60MMENDATION: <br />Staff recommends that the Board of County <br />final plat approval to Foxridge Subdivision, <br />man of the Board of County Commissioners to <br />the applicant, committing the applicant <br />remaining required improvements, and accept <br />guaranteeing the contract. <br />W, <br />Commissioners grant <br />authorize the Chair - <br />sign a contract with <br />to completing the <br />the performance bond <br />BOOK „ 0 PAGE 09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.