Laserfiche WebLink
SHERIFF'S ADMINISTRATION BUILDING PROJECT <br />The Board reviewed the following memo dated 10/29/87: <br />._TO: BOARD OF COUNTY COMMISSIONERS DATE: OCTOBER 29, 1987_ <br />VIA: CHARLES P..BALCZUN _ <br />COUNTY ADMINISTRATOR - - -_ <br />FROM: H. T. DEAN <br />OWNER'S A <br />A <br />IZED REPRESENTATIVE <br />SUBJECT: SHERIFF'S ADMINISTRATION BUILDING PROJECT <br />CHANGE ORDER IRC 3-8 <br />It was discovered during Hurricane Floyd's recent visit that the brick <br />pavers designed at each downspout on the subject project would not <br />handle an amount of rain water equal to what was experienced. Each one <br />of the pavers "blew out" and left large holes in the birm. <br />The architect, C. E. Block, reinstalled the pavers at his expense and <br />absorbed the new design cost. Installation of additional pipe to <br />eliminate future problems would cost $6,485.00. <br />Due -to the possibility of rain causing additional damage, it was <br />necessary to take immediate action to correct the problem. <br />Staff is requesting that the Board authorize execution of the Change <br />Order as presented. <br />Commissioner Bird felt this was another case of trying to <br />figure out what it would have cost if it had been designed this <br />way in the first place. <br />Sonny Dean advised that there is money for this in the <br />contingency fund. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Wheeler, the Board unanimously approved <br />Change Order 3-8 in the amount of $6,485 for the <br />installation of additional rain leader pipe at the <br />Sheriff's Administration Building. <br />35 <br />BOOK 70 Pa.E 130 <br />