Laserfiche WebLink
M <br />GENMALCONrnncroM <br />LV:9P.O. BOX 249 <br />October 23, 1987 <br />77 <br />PWR CORPORATION <br />HIGHLAND CITY, FLORIDA 33846-0249 <br />Tony Donadio <br />C.E.-Block Architect, Inc. <br />P.O. Box 1206 <br />Vero Beach, Florida 32962 <br />Re: Sheriff's Administration Building <br />Pavers <br />M <br />Dear Tony: <br />s <br />The cost to -reinstall the brick pavers and add 6" ABS drain <br />pipe to each downspout is expressed as follows: <br />1. Cost to relay brick pavers in 15 places. <br />180 MH @ $10.00 1 hr. (+)'fringes @ 1.2= <br />2. Cost to furnish and install 6" dia. ABS <br />pipe from rain gutter!.to bottom of slope <br />19 places @ 35'= 665 LF @ 8.71 LF= <br />Subtotal <br />10% mark-up + 1.5% bond + .5% permits= <br />Please issue a change order accordingly. <br />Sincerely, <br />PWR C,ORRPO(RAATION <br />A�)- �`1• C <br />William G. Issitt- <br />President <br />37 <br />Total <br />$2,160 <br />$5,790 <br />7,950 <br />$954.. <br />$8,904. <br />8131646-1408 <br />BooK.`�0 PA -132 <br />