Laserfiche WebLink
ZURRENT D.O. CONDITIONS:.10 and 11 <br />ATTACHMENT #2 <br />10.. Prior to the issuance of a certificate of occupancy for <br />any structure, the developer shall construct the proposed <br />estuarine waterway system. Failure to construct such a <br />system shall constitute a substantial deviation and the <br />project shall be subject to further review. <br />11._ Prior to the issuance -of a certificate -of occupancy for <br />any structures, the e s turarine /waterway system shall be <br />connected to the Indian .River. Lagoon. No connection of <br />the excavated, estuarine/waterway system shall - be'made to <br />either the lagoon or the existing connected open water <br />basin (marina 1) until such time as DDT, other restricted <br />constituents, and standard water quality parameters within <br />that system have been reduced to levels at or below <br />background levels of such constituents within the Indian <br />River Lagoon, and -until such time as shorelines have been <br />stabilized 'and the 'littoral zone habitats along the edge <br />of the •wetland areas and estuarine/waterway system have <br />been planted and work inspected.by Treasure_ Coast Regional <br />Planning Council and Indian River County. The developer <br />shall at his own expense, submit tests that show the <br />estuarine/waterway system to be at or below 'background <br />levels of DDT and other restricted constituents. Tests <br />shall be preformed by an independent laboratory selected <br />by the developer and approved by the County. -_The County <br />Environmental health Department shall monitor. the test <br />results. <br />PROPOSED D.O. AMENDMENT <br />ATTAC194ENT #3 I <br />"10. Prior-te-the- issae -off-the-certificate -of--occupancy- for- -any -structure;--+-te <br />developer--shaH--conatruet--the=proposed-*srtverine--waterwer-gystenrr The county, <br />upon receipt of a performance bond, letter of credit or other form of assurance <br />acceptable to the county, which such assurance guarantees a_ contract for the <br />developer to complete the approved estuarine waterway system riot to January 1_ <br />1989, may issue not more than 600 certificates of occupancy for dwelling units, <br />offices and commercial enterprises located in pods D, E, G, H, 1_ K, P and the <br />Harbor. Center. Completion of the approved estuarine waterway system shall include <br />connection to the Indian River. Failure to construct suct a the estuarine waterway <br />system shall constitute a substantial deviation and the project shall be subject to a <br />further review." <br />�� 11. -f'ri� --to--tfie-tsst+entt�#--a-certifies#e-ef-eeEapaney-#er- atr�r-strttett�re4j,--the <br />estuarinefweterway--systeer-s+mHl-be--eennectt-d--te--t+x--4-ndtan--River--L-ageen: No <br />connection of the excavated estuarine/waterway system shall be made to either the <br />lagoon or the existing connected open water basin (marina 1) until such time as <br />DDT, other restricted constituents, and standard water quality parameters within <br />that system have been reduced to levels at or below background levels of such <br />constituents within the Indian River Lagoon, and until such time as shorelines have <br />been stabilized and the littoral zone habitats along the edge of the wetland areas <br />and estuarine/waterway system have been planted and work inspected by Treasure <br />Coast Regional Planning Council and Indian River County. The developer shall at <br />his own expense, submit tests that show the estuarine/waterway system to be at or <br />below background levels of DDT and other restricted constituents. Test shall be <br />-performed by -an independent laboratory selected by the developer and approved by <br />the county. The County Environmental Health Department --shall monitor the test <br />results." - <br />5 9 BOOK 70 F" �� •J�6 <br />C E C ��7 <br />