Laserfiche WebLink
DEG <br />15 1287 eooF 70 FF. <br />Please note that the above cost proposals include consulting fees and <br />projected out-of-pocket expenses. <br />The Courthouse Advisory Committee recommends that the Board of County <br />Commissioners authorize the Chairman to execute a contract with Architects <br />Design Group of Winter Park, Florida for performance of the above <br />referenced work for a total fixed fee of $38,980. Please note that this <br />amount includes travel expenses of 1,000. <br />This matter is scheduled for your consideration at the December 15, 1987 <br />Board of County Commissioners meeting. <br />Administrator Balczun advised that Architect's Design Group <br />has agreed to include within its proposed structure an analysis <br />of our 5th courtroom space needs. <br />Commissioner Bird asked if there is some way we can expedite <br />that part of it, and Administrator Balczun advised that condition <br />could be made part of the contract award; however, the firm is <br />amenable to that. <br />Commissioner Wheeler wondered if they could do that without <br />having all the information. He felt, however, it is going to be <br />important to know where we are going with the whole complex. He <br />understood the architect will incorporate into the study the <br />type of courtroom need; the location, whether we need a grand <br />jury hearing room, a non -jury trial room, a 6 -member jury room, a <br />12 -member jury room, one courtroom, two courtrooms; and whatever <br />is needed in the interim. In addition, they will be looking at <br />space alternatives other than the Public Defender's Office, and <br />Commissioner Wheeler advised that he suggested that they look at <br />the Pocahontas Building across the alley and other buildings in <br />the area that are available. <br />Chairman Scurlock absolutely concurred that we should have a <br />long range plan instead of just reacting to immediate needs. <br />Commissioner Wheeler hoped to have something back to the <br />Board in 3 months so that we can move on this thing and get the <br />judges their other courtroom. <br />24 <br />M <br />M <br />