My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/1987
CBCC
>
Meetings
>
1980's
>
1987
>
12/15/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:21 AM
Creation date
6/12/2015 1:57:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/15/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®EC 15 <br />1997 <br />BOOK <br />70 Pn F, 3 <br />Public Works Director Jim Davis <br />advised that the <br />demolition <br />part of the Utilitie's project is underway, and. Chairman Scurlock <br />suggested that we take the architect's design plan and bid it out <br />to some local subcontractor and get that project done, rather <br />than trying to do it inhouse. <br />Director Davis advised that we are subbing out the work, but <br />did not know the revised completion date for the project. He <br />pointed out that Building & Grounds is no longer his department <br />and now falls under the Assistant County Administrator. <br />Chairman Scurlock understood that the billing offices of the <br />Utilities Department will be moving down the hall so that the <br />entire department will be located in the back of the building, <br />which includes the space vacated by the Drivers License Bureau, <br />and that the Administrator and the Assistant Administrator will <br />occupy the billing offices vacated by Utilities once they have <br />been renovated. <br />Commissioner Eggert felt we should put the pressure on to <br />complete this work so that Administrator Balczun can move into <br />` the renovated space as soon as possible. <br />Director Davis explained that the original estimated time <br />for construction was 45 days, but that estimate was made before <br />the architect became involved. <br />Administrator Balczun asked Utilities Director Terry Pinto <br />when he expected the renovation to be completed, but Director <br />Pinto didn't feel we have been realistic about the construction <br />time. He pointed out that we were required to have an architect <br />on the project because the renovation involved a load bearing <br />wall. This involved some necessary changes that will take even <br />more time than what was anticipated. Director Pinto emphasized <br />that they just received the final architectural plans today. <br />Chairman Scurlock just felt it was hard to believe that it <br />is taking this long to renovate these offices when an entire <br />house can be built in 6 weeks. <br />M <br />28 <br />M <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.