Laserfiche WebLink
JAS 5 398 <br />BOOK 70 PAGF 5I3 <br />Year to expend these funds. Substantial road preparation and drainage pipe <br />replacement is sometimes necessary, and staff recommends that instead of <br />trying to do this work in the last few months of the year, it would be <br />better to schedule the work over a longer period of time. For this reason, <br />the attached list of road resurfacing projects is presented for Board <br />approval. <br />ALTERNATIVES AND ANALYSIS <br />The attached list reflects 2.6 miles of roadway (33,557 SY of pavement). <br />The cost to construct a 1" asphalt overlay at $36.50/ton over the 2.6 miles <br />is approximately $70,000. Approximately $55,000 was spent on critical <br />repairs and resurfacing of 12th Street between 12th Avenue and 27th Avenue <br />and in resurfacing the Country Club bridge area. <br />If the attached list is approved, approximately $275,000 would remain <br />unencumbered for additional projects this year. <br />RECONMENDATION AND FUNDING <br />It is recommended that the attached list of roads be approved for resurfac- <br />ing. Funding to be from Account 111-214-541-035.31 Road and Bridge <br />Division Paving Materials. <br />TO: James W. Davis, P.E. <br />Public Works Director <br />DATE: November 30, 1987 FILE: <br />SUBJECT: Roads to be Resurfaced <br />FROM: Albert L. VanAuken, Supt. f�REFERENCES: <br />Road & Bridge Division <br />The following is a list of roads to be resurfaced: <br />6th Ave. from 19th St., S.W. to Highland Dr. <br />20th St., S.W. from 6th Ave., S.W. to 4th Ave., S.W. <br />3rd Ave. between 15th & 16th Streets <br />CR 507 from Broadway to Babcock <br />14th St., S.W., 27th Ave. to 17th Ct. <br />1st St. from 43rd AVe. to 50th Ave. <br />641' 4 -✓e - /0t' Ss I /Z'" sr <br />44 <br />.3 Mile <br />.2 Mile <br />.1 Mile' <br />.5 Mile <br />.7 Mile <br />.5 Mile <br />