My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/19/1988
CBCC
>
Meetings
>
1980's
>
1988
>
1/19/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:17:58 AM
Creation date
6/12/2015 2:02:49 PM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,'"- <br />JAN 19 1988 <br />CERTIFICATE. OF <br />SUBSTANTIAL <br />COMPLE ION <br />AIA DOCUMENT G704 <br />OWNER <br />ARCHITECT <br />CONTRACTOR <br />FIELD <br />OTHER <br />0 <br />0 <br />0 <br />BOOK 70 FACT 568 <br />PROJECT: Sheriff's Administration <br />(name, address) 911 Center <br />TO (Owner) <br />1 <br />Indian River County Commission <br />1840 - 25th Street <br />Vero Beach, Florida 32960 <br />ARCHITECT: C,E, Block Architect, Inc, <br />ARCHITECT'S PROJECT NUMBER: 8643 <br />CONTRACTOR: PWR Corporation <br />CONTRACT FOR: 1 story administration office <br />building/911 facility <br />L_ J CONTRACT DATE: 10/13/86 <br />DATE OF ISSUANCE: November 4, 1987 <br />PROJECT OR DESIGNATED AREA SHALL INCLUDE: The 911 Facility and, the care <br />computer room (room 110A). This does not include the remaining S'heriff's <br />Administration Building. <br />The Work performed under this Contract has <br />been reviewed and found to be substantially complete. The Date of Sub- <br />stantial Completion is hereby established as r <br />which is also the date of commencement of all warranties and guarantees required by the Contract Documents. <br />DEFINITION OF DATE OF SUBSTANTIAL COMPLETION <br />The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect when <br />construction is sufficiently complete, in accordance with the Contract Documents, so the Owner may occupy the Work or <br />designated portion thereof for the. use (or which it is intended. <br />A list of items to be completed or corrected, prepared by the Contractor and verified and amended by the Architect, is <br />appended hereto. The failure to -include any items on such li does not alter the responsi ty of the Contractor to com- <br />plete all Work in accordance with the Contract Documents. <br />C.E. Block Architect, Inc. <br />ARCHITECT <br />The Contractor will complete or correct the Work on the list of items appended hereto within <br />from the above Date of Substantial Completion. <br />PWR Corporation <br />CONTRACTOR <br />The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof <br />(date). <br />/e/ <br />DA E <br />10 <br />// <br />DA E <br />days <br />at 8:00 am. <br />(time) on <br />Chaimn of LA_. County Commission <br />BY <br />OWNER <br />Tsday Novemb-r <br />1 <br />9 <br />/—/ i? Sr <br />DATE <br />The responsibilities of the Owner and the Contractor for maintenance, heat, utilities and insurance shall be as follows: <br />(NOTE -Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage) <br />'Approved as to form <br />an`egal S ic ;racy <br />By <br />Sharon Phillips Brenn <br />Asst County Attorney <br />n <br />at.s .Ara 9,.14ki' @Ica • err.Tfr;CdTr nr '.1!8STANTIAI COMPLETION • APRIL 7970 COITION . AIA® <br />ON( PAC( <br />CERTIFICATE W/LIST OF ITEMS TO BE -CORRECTED ON FILE IN OFFICE OF <br />CLERK TO BOARD. <br />(On file in Contracts & Agreements file) <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.