Laserfiche WebLink
Ott"" TL N006 <br />Bond Issue <br />Issuance Cost <br />Sub -Total <br />Computer System <br />Sub -Total <br />Consultant (Waters) <br />Sub -Total <br />Main Library - $70 Sq. Ft. <br />Sub -Total <br />North County - $70.Sq. Ft. <br />Surplus (Deficit) <br />Better but Basic Construction <br />$75.00 Sq. Ft. <br />Surplus (Deficit) <br />LIBRARY PROJECT COST <br />SCENARIO ONE <br />• Grace Lutheran (39,415*) <br />North Cty. Library (15,000*) <br />$5,900,000 <br />($250,000) <br />. $5,650,000 <br />($300,000) <br />$5,350,000 <br />($38,000) <br />' $5,312,000 <br />($4,309,050) <br />$1,002,950 <br />($1,396,900) <br />($393,950) <br />($272,075) <br />($666,025) <br />ESTIMATE - UPDATED MARCH 28, 1988 <br />SCENARIO TWO SCENARIO THREE <br />Grace Lutheran (35,000*) Old Jail Site (35,000*) <br />North Cty. Library (15,000*) North Cty. Library (15,000*) <br />$5,900,000 <br />($250,000) <br />$5,650,000 <br />($300,000) <br />$5,350,000 <br />($38,000) <br />$5,312,000 <br />($3,985,000) <br />$1,327,000 <br />($1,396,900) <br />($69,900) <br />• ($250,000) <br />($319,900) <br />*Square Feet <br />NOTE: A figure of $70/square foot was used as a construction cost. This includes architectural fees, site work, <br />building construction, irrigation and landscaping. Most libraries are built in the $70 to $120 range, <br />so this is bare bones. <br />$5,900,000 <br />($250,000) <br />$5,650,000 <br />($300,000) <br />$5,350,000 <br />($38,000) <br />$5,312,000 <br />($3,515,800) <br />• $1,796,200 <br />($1,396,900) <br />$399,300 <br />($250,000) <br />$149,300 <br />1 <br />