My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/5/1988
CBCC
>
Meetings
>
1980's
>
1988
>
4/5/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:49:42 AM
Creation date
6/5/2015 9:26:42 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/05/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chairman Scurlock felt we need to have more information on <br />this, and Director Barton advised that this is a supplement to <br />the proposal that was before the Board about 6 weeks ago. <br />Commissioner Eggert understood that Personnel is doing so <br />much of it by hand, and a lot of the burden has been falling on <br />OMB Director Joe Baird. <br />Commissioner Bird suggested that we table this for one week, <br />and Commissioner Eggert wanted to see a copy of the original <br />proposal. <br />ON MOTION by Commissioner Bird, SECONDED by <br />Commissioner Eggert, the Board unanimously <br />tabled this item until next week's meeting. <br />AWARD OF CONTRACT #1 - GENERAL CONSTRUCTION - REVERSE OSMOSIS <br />PLANT IMPROVEMENTS <br />The Board reviewed the following memo dated 3/16/88: <br />TO: <br />THRU: <br />FROM: <br />CHARLES P. BALCZUN <br />COUNTY ADMINISTRATOR <br />TERRANCE G. PINTO< <br />DIRECTOR OF UTILITY SERVICES <br />WILLIAM F. McCAIN <br />PROJECTS ENGINEER/ <br />DEPARTMENT OF UTIL S 'fICES <br />DATE: MARCH 16, 1988 <br />SUBJECT: AWARD OF CONTRACT. #1 - GENERAL CONSTRUCTION REVERSE <br />OSMOSIS PLANT IMPROVEMENTS <br />INDIAN RIVER COUNTY PROJECT NO. UW -88 -01 -WC <br />BACKGROUND <br />Two bids have been received for the aforementioned work. The <br />bidders are: <br />a. Butler Construction Company, Rockledge, FL. <br />b. Metro Equipment & Construction Association Inc., <br />Orlando, FL. <br />ANALYSIS <br />The bids have been Itipas:46L=Lird with regard to the following: <br />a. General compliance with instructions <br />b. Equipment manufactures <br />c. Subcontractors <br />d. Summary of prices <br />e. Unit prices <br />60 <br />APR 5 1989 <br />BOOR 71 .f r,.E 4..7O <br />
The URL can be used to link to this page
Your browser does not support the video tag.