My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/17/1988
CBCC
>
Meetings
>
1980's
>
1988
>
5/17/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:51:50 AM
Creation date
6/12/2015 2:17:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/17/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 171933 <br />-I <br />BOOK 7 f'1 .. m39 ! ' <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Eggert, the Board unanimously <br />accepted the User Fee Study performed by Mayes, <br />Sudderth, and Etheredge, Inc., and released the <br />10% retainage in the amount of $976, as recommended <br />by staff in the above memo. <br />PURCHASE OF CARPETING FOR UTILITIES DEPARTMENT <br />TO: CHARLES P. BALCZUN <br />COUNTY ADMINISTRATOR <br />THRU: JOSEPH A. BAIR <br />DIRECTOR OF OM <br />FROM: TERRANCE G. PINT <br />DIRECTOR OF UTILW�CES <br />SUBJECT: CARPETING FOR RENOVATING <br />UTILITIES DEPARTMENT AREA <br />BACKGROUND <br />When the renovation work went out for bid, Creative Floors of Vero <br />Beach bid an installed price on Arena II carpet in the amount of <br />$6,800.00. This bid exceeds the original estimate of $4,776.00. <br />Since the bid came in, several other considerations must be <br />addressed: <br />1) Comparison of carpet quality and durability due to the <br />high volume of traffic experienced by our Department. <br />2) Volume of floor preparation required to firmly secure the <br />new carpet. <br />A discussion with Lynn Williams and Jim Wright produced the <br />following recommendations: <br />1) Upgrade the original quality of carpet. <br />2) Establish a new cost for the floor preparation due to the <br />discovery of various floor textures previously hidden <br />under old carpet. <br />Analysis <br />Evans Carpet has negotiated with Jim Wright for the floor <br />preparation of utility area with a net change of $2,024.00. Funding <br />will come from account 471-000-162-003.00. This will increase the <br />original contract price of $64,620.00 to $66,644.00. This will be <br />considered change order number 1. <br />Recommendation <br />At this time the Utility Department asks that the Board of County <br />Commissioners approve this change to the original contract, so our <br />renovation work can continue without delay. <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.