My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/12/1988
CBCC
>
Meetings
>
1980's
>
1988
>
7/12/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:10 PM
Creation date
6/12/2015 2:22:38 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/12/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrator Balczun reviewed the following letter listing <br />the 10 major revisions to the engineer's fee proposal: <br />GLACE & RADCLIFFE, INC. CONSULTING ENGINEERS <br />800 S. ORLANDO AVENUE MAITLAND, FL 32751-5627 (407) 647-6623 <br />MAIL TO: P.O. BOX 1180 WINTER PARK, FL 32790-1180 <br />June 10, 1988 <br />Mr. James W. Davis, P.E. � J �U " rL Jd e <br />Public Works Director '� '. <br />Indian River County ✓(/y <br />1840 25th Street 798g <br />Vero Beach, Florida 32960 <br />SUBJECT: Indian River Boulevard - Phase IV <br />Indian River county <br />GSR No. 88514 <br />Dear Jim <br />Enclosed are two (2) copies of our revised fee proposal with attached <br />supporting manhours, by activity, for the referenced project. The fee <br />proposal is based on the scope of work contained in the draft Agreement <br />which you furnished under letter dated April 15, 1988 and modified by our <br />discussions of June 3, 1988. Major revisions to the fee proposal submitted <br />with our letter of May 3, 1988 include: <br />1. Elimination of requirements for right-of-way maps and descriptions <br />.and right-of-way surveys. <br />2. Elimination of aerial photography. <br />3. Reduction of project length by eliminating the 500 feet south of <br />37th. <br />4. Elimination of services for 37th, except as it affects the <br />beginning of the project. <br />5. Elimination of work from the east side of.US 1 to the west on 41st <br />and 45th, which eliminates 4 intersections and attendent traffic <br />studies. <br />6. Reduction of the work area on US l at the intersection of US 1 and <br />53rd to roughly 1100 linear feet. <br />7. Reduction of the work effort at Indian River Boulevard and 53rd. <br />8. Elimination of the proposed bridge at Crand Harbor from our Scope <br />of Service (except to review the structure, designed by others, <br />for structural adequacy). <br />JUL 12 , 2 7 BOOK 73 FA -UF 233 <br />
The URL can be used to link to this page
Your browser does not support the video tag.