My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/6/1988
CBCC
>
Meetings
>
1980's
>
1988
>
9/6/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:11 PM
Creation date
6/12/2015 2:21:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/06/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Eggert noted that when she finally got to talk <br />with the representative from Mercer/Slavin, she got the feeling <br />that he was more or less back pedaling out from what she had <br />thought they were going to do re general testing and giving the <br />applicants problems to solve, and she wanted to be very sure we <br />understand clearly just what they will and what they won't do. <br />Acting Administrator Collins believed they are committed to <br />doing the problem solving type of practical testing at no extra <br />cost, but there were some other things, such as psychological <br />testing which would be an extra cost.item. Mr. Collins' personal <br />feeling was that was not needed, but if the Board wished, that <br />could be included. <br />Commissioner Eggert did not feel that was necessary, but <br />just wanted to be very sure that Mercer/Slavin are capable and <br />willing to give the general tests. <br />Mr. Collins confirmed that is one of the things he specifi- <br />cally insisted on and we are making a minor contract change to be <br />sure they do that and at no extra cost. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried (4-0) <br />COPY OF SAID CONTRACT IS ON FILE IN THE OFFICE OF CLERK TO THE <br />=•'� <br />CHANGE TO REROOFING CONTRACT <br />The Board reviewed memo from the Building & Grounds Super- <br />intendent: <br />$, <br />SEP 6 1988 79 81 <br />E�OK 1� F <br />
The URL can be used to link to this page
Your browser does not support the video tag.