My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/4/1988
CBCC
>
Meetings
>
1980's
>
1988
>
10/4/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:22:26 AM
Creation date
6/12/2015 2:27:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/04/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Director Davis advised that college student Tom Ruge from <br />Georgia Tech worked with staff over the summer preparing this <br />plan. There were many aspects of the plan, and it involved a lot <br />of work dealing with the environmental and historical considera- <br />tions, artifacts, etc. He emphasized that this is a management <br />plan, not a site plan nor a detailed construction plan, and the <br />main emphasis is an oceanfront recreation facility providing <br />beach access for residents of the county. <br />Commissioner Eggert expressed concern about any parking that <br />might require people to cross A -1-A. <br />Commissioner Bird believed that Director Davis and the <br />young man from Georgia Tech are to be commended on the plan. He <br />noted that we are trying to leave as much open space and natural <br />vegetation as we can and yet provide access to the beach and a <br />minimal amount of the facilities the public would expect. This <br />plan can be expanded in the -future if needed, and Commissioner <br />Bird felt it is a good blend between nature and making facilities <br />available to the public. <br />Commissioner Bowman hoped that if it is planned to allow RVs <br />and campsites, etc., that there will be a charge, and this was <br />confirmed. <br />Acting Administrator Collins also wished to compliment <br />Director Davis and informed the Board that the plan was completed <br />about 10 months ahead of the DNR schedule. <br />ON MOTION by Commissioner Eggert, SECONDED by Commis- <br />sioner Bird, the Board unanimously (4-0) approved <br />the Land Management Plan for North Beach Complex <br />and authorized that it be transmitted to the DNR. <br />COPY OF SAID PLAN IS ON FILE IN THE OFFICE OF THE DIRECTOR OF <br />PUBLIC WORKS. <br />37 <br />OCT 41988 <br />BOOK 74 PA riE 434 <br />
The URL can be used to link to this page
Your browser does not support the video tag.