My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/1/1988
CBCC
>
Meetings
>
1980's
>
1988
>
11/1/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:24:07 AM
Creation date
6/12/2015 2:32:58 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/01/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />THRU: <br />FROM: <br />WILLIAM G. COLLINS, II <br />ACTING COUNTY ADMIN <br />TERRANCE G. PINTOX <br />DIRECTOR OF UTILITY RVICES <br />WILLIAM*F. McCAINi <br />PROJECTS ENGINEER r( ' - <br />DEPARTMENT OF UTILITY SERVICES <br />DATE: OCTOBER 4, 1988 <br />SUBJECT: CHANGE ORDER #1 - GENERAL CONSTRUCTION CONTRACT #1 <br />SOUTH COUNTY R.O.PLANT IMPROVEMENTS -IRC PROJECT #WW -88 -01 -WC <br />BACKGROUND <br />At the onset of the above mentioned project, a high service pumping <br />study was under way by D.S.S. Engineers. The H.S.P. study concluded <br />that certain upgrades of our pumping system needed to be done to meet <br />higher system pressure and flow requirements. The engineers <br />recommended the installation of three new pump ends and the total <br />replacement of the smallest existing H.S.P. Associated piping <br />changes also need to be made, along with the addition of several new <br />valves in the discharge piping. (For specific details, see Section 1.3 <br />and 1.4 of the attached High Service Pumping Study.) <br />There will also be modifications to suction and discharge piping <br />wall penetrations at the plant. This is necessitated by cracking <br />which has occurred in these lines at the wall penetrations. All of the <br />aforementioned work was intended to be accomplished by the general <br />contractor on this job via a change order; therefore, monies are <br />available. <br />ANALYSIS <br />Our engineers for this project have prepared a change order for this <br />work (which is attached), and the contractor has submitted a price <br />quote (which is attached). D.S.S. Engineers have reviewed the <br />contractor's submittal and have recommended that we proceed. (See <br />attached letter of recommendation.) The bottom line price for the work <br />is $142,791.00. <br />RECOMMENDATION <br />The Department of - Utility Services recommends approval of this <br />change order by the Board of County Commissioners. <br />ON MOTION by Commissioner Eggert, SECONDED by Commis- <br />sioner Bowman, the Board unanimously approved Change <br />Order #1 for the South County R.O. Plant Improvement <br />Project (Butler Construction Co.) <br />77 <br />NOV 1988 <br />BOOK 75 FACE 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.