My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/1988
CBCC
>
Meetings
>
1980's
>
1988
>
11/15/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:25:06 AM
Creation date
6/12/2015 2:34:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/15/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternative No. 1 <br />Authorize the Chairman to execute the Change Order for <br />installation of the needed material. The cost of this <br />alternative is a $4,100 increase in the project cost. <br />Alternative No. 2 <br />Complete the bridge with less than needed rip -rap protection <br />of banks. This alternative could result in increased <br />maintenance over the life of the project and possibly <br />shorten the useful life gran of the bridge. <br />RECOMMENDATION AND FUNDING <br />The staff recommends that Alternative No. 1 be approved. Fund is <br />from Road & Bridge Fund 111-214-541-066.51. <br />Construction progress indicates at this time that even with this <br />change it is still possible to complete the project within the <br />original contract price of $269,233.44. <br />ON MOTION by Commissioner Bowman, SECONDED by Com- <br />missioner Eggert, the Board unanimously approved <br />Alternative No. 1, authorizing the Chairman to <br />execute Change Order #1, as recommended by staff. <br />CHANGE ORDER <br />No. 1 <br />Dated October 26. 1988 <br />Owner's Project No. 'Tr `i <br />Project <br />Engineer's Project No: 88-167 <br />KING'S HIGHWAY BRIDGE PHASE I <br />Owner Indian River County <br />Contractor Murphy Construction Co. Contract Date August 1. 1988 <br />Contract For King's Highway Bridge Replacement at N. Relief•Canal <br />Nature of the Change: Increase in Contract Quantity for Item No. 5, Riprap, <br />Sand -Cement <br />Item Plan Revised Unit <br />No. Description Qty. Qty. Price <br />Increase in <br />Contract Amount <br />5 Riprap, Sand - <br />cement 37 CY 57 CY $205.00 $4,100.00 <br />Reason for Change: Engineers estimated quantity was in error due to lack of <br />survey data reflecting actual profile of canal banks under <br />existing structure. <br />COV 15 1988 <br />35 <br />BOOK <br />F.,��E ..`79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.