My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/1988
CBCC
>
Meetings
>
1980's
>
1988
>
11/15/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:25:06 AM
Creation date
6/12/2015 2:34:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/15/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTERNATIVES AND ANALYSIS <br />Since Mr. Mitchell was under contract with Pan American <br />Engineering, this work was not competitively bid. The County did <br />have bids received for this work recently, and the price bid is <br />the same as the cost that Pan American Engineering is charging. <br />RECOMMENDATION AND FUNDING <br />It is recommended that the Board approve the $4,277.50 payment to <br />Pan American Engineering for subgrade marl. Funding to be from <br />Petition Paving account 173-214-541-035.39 (Paving materials). <br />Director Davis informed the.Board that the only direct <br />payment not under county contract was this $4,277, and staff will <br />bring the final assessment roll to the Board shortly. <br />ON MOTION by Commissioner Wheeler, SECONDED by Com- <br />missioner Eggert, the Board unanimously approved the <br />payment of $4,277.50 to Pan American Engineering for <br />subgrade marl as recommended by staff. <br />KING'S HWY. BRIDGE REPLACEMENT - CHANGE ORDER #1 (MURPHY CONST.) <br />Director Davis reviewed the following, explaining that "rip - <br />rap" actually is bags of sand cement: <br />TO: William G. Collins, II <br />Acting County Administrator <br />THROUGH: James W. Davis, P.E.,,g�' <br />Public Works Director (1 <br />FROM: James D. White, P.E. <br />Capital Project Manager <br />SUBJECT: Change Order #1, Murphy Construction, <br />Kings Highway Bridge Replacement - <br />North Relief Canal <br />DATE: November 2, 1988 <br />DESCRIPTION AND CONDITIONS <br />Construction of the bridge required an increase in the quantity <br />of sand cement rip -rap request for the project. The cause of the <br />increase was an error in the Engineer's Estimate of quantities <br />because of inadequate survey data under the old structure. <br />ALTERNATIVES AND ANALYSIS <br />The Alternatives are as follows: <br />34 <br />N O V 15 1988 <br />BOOK 71 FAL:1278 <br />
The URL can be used to link to this page
Your browser does not support the video tag.