in. We have been averaging 180-212 inmates, and our maximum <br />capacity is 236. <br />Chairman Scurlock felt the answer to some extent is the lead <br />time. Although you are talking about 38-40 beds being available <br />now, when you consider a referendum, bidding, construction, etc., <br />you are talking about 21 years before you can occupy the <br />tacility, and we will need those beds. <br />Commissioner Wheeler stressed that we are in a position <br />where we are making do to keep felons that should be in maximum <br />security in minimum security right now, and the Phase III project <br />is maximum security.. <br />The Board returned to discussion of proposed changes in <br />design, and Chairman Scurlock believed one of the major design <br />changes that increased costs was the kitchen. There were also <br />some changes in the admitting area and -the clinic and medical <br />area. He asked if the kitchen as proposed will be adequate for <br />all future phases. <br />Mr. Sebring stated that it should be adequate as it is <br />designed to serve 1,200 meals per sitting. They do not have all <br />the equipment in to serve that many at this point, but they are <br />providing the space for it to be installed in the future. They, <br />will put in enough equipment to serve at least 600 per sitting. <br />John Silver reported that, including Future Pods E and F, <br />the total anticipated future inmate capacity is 1,200. <br />Commissioner Wheeler stressed that he went through two years <br />of study to come up with projections on inmates and still fell <br />far short. We do not want to keep on doing this. <br />Commissioner Eggert pointed out that if we don't have a core <br />situation that is adequate to begin with, it is harder and harder <br />to add to it. It is much cheaper to put it in in the beginning. <br />Commissioner Bird wished to know about the staffing needs <br />for this addition as he did not want any surprises this time. <br />Captain Reese advised that approximately 56 additional staff <br />will be required for Phase III. We have 88 now. <br />44 <br />DEC 6 1988 <br />BOO 75 Fl: c 295 <br />