My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/1988
CBCC
>
Meetings
>
1980's
>
1988
>
12/20/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:28:47 AM
Creation date
6/12/2015 2:38:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/20/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC2 <br />BOOK . 5 FACE 423 <br />GOLDEN SANDS PARK PROJECT, CHANGE ORDER #1 (DICKERSON) <br />The Board reviewed the following memo: <br />TO: William G. Collins II <br />Acting County Administrator <br />FROM: James D. White, P.E. <br />Capital Project Manage <br />THROUGH: James W. Davis, P.E., <br />Public Works Director:`' <br />DATE: November 30, 1988 <br />I 411X:c <br />SUBJECT: Change Order No. 1, Dickerson, Florida, Inc. <br />Construction, Golden Sands Park Project, <br />Modifications to SR A -1-A <br />DESCRIPTION AND CONDITIONS <br />The Florida DOT refused to issue drainage connection and access <br />permits (permit to modify highway) at Golden Sands Parks as it <br />was originally designed by Architect/Engineer Mayes, Sudderth & <br />Etheredge. After bids were opened and a contract for the work <br />was awarded, the modified design was subsequently approved by DOT <br />and a permit issued. This new design requires turn and <br />deceleration lanes about twice the length of those in the <br />original design. As a result, the cost of the construction will <br />increase by $42,011.90 to $89,284.70. <br />ALTERNATIVES AND ANALYSIS <br />The alternatives are as follows: <br />Alternative No. 1 <br />Authorize the chairman to execute the Change Order as prepared. <br />• <br />Alternative No. 2 <br />Reject the Change Order and direct staff to renegotiate terms, <br />with the Contractor and DOT. This choice might lead to a claim <br />for delay by the Contractor or rejection by DOT. <br />RECOMMENDATION AND FUNDING <br />The staff recommends that Alternative No. 1 be approved. The <br />result of this Change Order is a cost increase of $42,011.90 on <br />the contract, to Indian River County. <br />Question came up as to the funding for this item as well as <br />the previous item, and it was agreed to hold it over also until <br />the OMB Director could clarify the funding. <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.