My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/1988
CBCC
>
Meetings
>
1980's
>
1988
>
12/20/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:28:47 AM
Creation date
6/12/2015 2:38:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/20/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - <br />DEG 20 1988: <br />BOOK 75 FACE 427 <br />ATTACHMENT GOLDEN SANDS PARK/A1A IMPROVEMENTS 11/4/88 <br />ORIGINAL BID QUANTITIES <br />Mobilization, Maint. of Traffic <br />Grading <br />15" Coquina Base <br />1" S-1 <br />FC -2 <br />Final Dress <br />Sodding <br />Striping <br />Bond -- <br />REVISED ADDITIONAL QUANTITIES <br />Maintenance of Traffic <br />Grading <br />6' Stabilized Shoulder <br />15" Coquina Base <br />4" Coquina Base Shoulder <br />Remove Existing Shoulders <br />1" S-1 (DELETE) <br />2.5" S-1 <br />S -III Leveling <br />FC -2 <br />Final Dress <br />Sodding <br />Striping <br />Bond <br />1 LS <br />1 LS <br />1581 SY <br />1500 SY <br />3700 SY <br />1 LS <br />2000 SY <br />1 LS <br />1 LS <br />Original <br />& LUMP SUM ITEMS <br />1 LS <br />1 LS <br />1752 SY <br />285 SY <br />1175 SY <br />2592 LF <br />1500 SY <br />3184 SY <br />3456 SY <br />2200 SY <br />1 LS <br />1505 SY <br />1 LS <br />1 LS <br />3000.00 <br />5400.00 <br />13.82 <br />2.80 <br />1.35 <br />1100.00 <br />0.93 <br />4500.00 <br />400.00 <br />Subtotal <br />300.00 <br />1730.00 <br />1.50 <br />13.80 <br />3.95 <br />0.90 <br />2.80 <br />5.50 <br />1.70 <br />1.35 <br />850.00 <br />0.93 <br />2040.00 <br />-0- <br />Revised Subtotal <br />REVISED CONTRACT TOTAL <br />3,000.00 <br />5,400.00 <br />21,817.80 <br />4,200.00 <br />4,995.00 <br />1,100.00 <br />1,860.00 <br />4,500.00 <br />400:00 <br />$47,272.80 <br />300.00' <br />1,730.00 <br />2,628.00 <br />3,933.00 <br />4,641.25 <br />2,332.80 <br />-4,200.00 <br />47, 512,.00 <br />5,875.20 <br />2,970.00 <br />850.00 <br />1,399.65 <br />2,040.00 <br />-0- <br />$42,011.90 <br />$89,284.70 <br />FINAL ASSESSMENT 37TH AVE. FROM 12TH ST. TO 14TH ST. <br />The Board reviewed memo from the Engineering Dept.: <br />TO: Honorable ,Poar of County Cissioners <br />0 <br />Ralph N. Brescia, P.E. <br />County Engineer. <br />G' ru f .6.244r <br />THROUGH: <br />FROM: <br />SUBJECT: <br />DATE: <br />Michelle A. Terry, CET <br />Civil -Engineer <br />Final Assessment for 37th Avenue from 12th Street to <br />14th Street <br />December 5, 1988 <br />DESCRIPTION AND CONDITIONS <br />The paving of the above road has been completed. Listed <br />below is a comparison of the preliminary estimate and the final <br />costs to the homeowners. It is noted that all construction cost <br />are under the original estimates: <br />Road <br />37th Avenue <br />Prelim. Est. <br />$39,390.00 <br />Final Cost <br />$33,859.23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.