My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/24/1989
CBCC
>
Meetings
>
1980's
>
1989
>
1/24/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:19:18 AM
Creation date
6/12/2015 2:42:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/24/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />r <br />Page 2 of_ <br />CONTRACT CHANGE ORDER <br />"CHANGE ORDER NO. - __ -- —_.Previous CONTRACT PRICE 279,75 <br />75-0 <br />DATE: REVISED CONTRACT PRICE ll7 ,445.E <br />JOS NAME Iiidia'an (fiver County Project #US85-08-ED - <br />Gi ford Area rawer Project Z retract #2 Effluent Disposal System <br />Board of County Commi=sioners <br />OWNER: <br />In•ian •j.ver ount <br />GIFFORD AREA SEWER PROJECT - CHANGE ORDER #2 - SEWAGE <br />COLLECTION/TRANSMISSION SYSTEM <br />The Board reviewed the following memo dated 1/16/89: <br />DATE: JANUARY 16, 1989 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />THRU: TERRANCE G. PIN <br />DIRECTOR OF UT <br />VICE <br />FROM: ERNESTINE W. WILLIAMS <br />MANAGER OF PROJECT ADMINISTRATION <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: CHANGE ORDER NO. 2 - GIFFORD AREA SEWER PROJECT <br />CONTRACT #3 - IRC PROJECT NO. US -85 -07 -CCS <br />SEWAGE COLLECTION/TRANSMISSION SYSTEM <br />BACKGROUND: <br />During field excavation to install the gravity sewer line at 38th <br />Place and 19th Avenue, it was discovered that the existing 8" <br />68 <br />JAN 241900 <br />ROOK 75 F'GE 716. <br />A...........................—...:-....4 <br />i <br />Previous <br />REVISED <br />UNIT <br />Previous <br />TOTAL <br />UNIT <br />PRICE <br />TOTAL <br />ITEM <br />DESCRIPTION <br />PRICE <br />UNITS <br />PRICE <br />CHANGE <br />CHANGE <br />_PRICE <br />18. <br />Clearing & Hauling C <br />Lump Sum <br />- <br />- <br />+11.S. <br />+ 8,000.00 <br />8,000.00 <br />Bent Pines <br />.. <br />19. <br />6" Dia. Force Main <br />Lurnp Sum <br />- <br />- <br />+1.181 <br />+35,000.00 <br />35,000.00 <br />Canal Crossing of <br />Lateral "0" Canal <br />,1• <br />20. <br />8"0 Plug Valve <br />1200.00 <br />- <br />- <br />+1 <br />+ 1,200.00 <br />1,200.00 <br />21. <br />6"0 Plug Valve <br />800.00 <br />- <br />- <br />+1 <br />+ 800.00 <br />800.00 <br />22. <br />Seed & Mulch for <br />0.75 <br />- <br />- <br />+6750 <br />+ 5,062.50 <br />5,062.50 <br />Sewer Force Main <br />L.F. <br />Restoration <br />- <br />23. <br />12"0 D.I.P. Gray. <br />60.00 <br />- <br />- <br />+15 L.F. <br />+ 900.00 <br />900.00 <br />Sewer, i4'-16' Deep <br />__ <br />TOTAL: <br />190,687.50 <br />470,445.00 <br />GIFFORD AREA SEWER PROJECT - CHANGE ORDER #2 - SEWAGE <br />COLLECTION/TRANSMISSION SYSTEM <br />The Board reviewed the following memo dated 1/16/89: <br />DATE: JANUARY 16, 1989 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />THRU: TERRANCE G. PIN <br />DIRECTOR OF UT <br />VICE <br />FROM: ERNESTINE W. WILLIAMS <br />MANAGER OF PROJECT ADMINISTRATION <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: CHANGE ORDER NO. 2 - GIFFORD AREA SEWER PROJECT <br />CONTRACT #3 - IRC PROJECT NO. US -85 -07 -CCS <br />SEWAGE COLLECTION/TRANSMISSION SYSTEM <br />BACKGROUND: <br />During field excavation to install the gravity sewer line at 38th <br />Place and 19th Avenue, it was discovered that the existing 8" <br />68 <br />JAN 241900 <br />ROOK 75 F'GE 716. <br />
The URL can be used to link to this page
Your browser does not support the video tag.