Laserfiche WebLink
BOOK 7 ESE 71 I <br />diameter water main is in direct conflict with the proposed sewer <br />line. This situation requires that the 8" diameter water main be <br />raised to accommodate the installation of the sewer line. The cost <br />to do this is $1,200.00. <br />Also, field excavation for gravity sewer' on the west side of U.S. <br />#1, South of 41st Street, uncovered a Southern Bell duct run. This <br />duct run includes a fiber optic cable. To construct the gravity <br />sewer, extreme caution must be used during excavation. This <br />includes stainless steel bands around ducts at all locations aroundwhere <br />duct bank is exposed, dewatering, and possibly hand -digging <br />the fiber optic cable. The additional cost for this construction is <br />$7,030.00. <br />ANALYSIS: <br />The increase in contract price to make these necessary changes is <br />$8,230.00. <br />RECOMMENDATION: <br />Charles Hudnell of Farmer's Home Administration (FmHA), West Palm <br />Beach, has verbally given authorization to proceed with this change <br />order. <br />The <br />ofstaff <br />CountyfCommissionersDepartment <br />approvalUtility <br />ChangeServices <br />recommends <br />OrderNo. <br />the Board2. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />Change Order #2, as set out in the above staff <br />recommendation. <br />69 <br />