My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/31/1989
CBCC
>
Meetings
>
1980's
>
1989
>
1/31/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:22:17 AM
Creation date
6/5/2015 11:25:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/31/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK <br />75 <br />JAW '31 'i989 <br />FGE77 <br />now, and he believed that all 3 compartments would be available <br />on a 5 year lease only. <br />Commissioner Scurlock noted that we could make a counter <br />offer. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Eggert, the Board unanimously authorized <br />staff to pursue leasing the Cappelen Building on a <br />short term basis and making necessary alterations in a <br />moderate way; authorized staff to extend the contract <br />with our existing architect to address the additional <br />space needs; and also directed staff to acquire addi- <br />tional lots to square off the property located north <br />of the Administration Building and to proceed as fast <br />as possible to build a new health facility on this site. <br />PAVING 38TH COURT FROM 45TH STREET TO 47TH STREET <br />The Board reviewed memo from County Engineer Brescia: <br />TO: Honorable Board of County Commissioners <br />THROUGH: Jim Davis, P.E. <br />Public Works Directo�� <br />THROUGH: aph Brescia, P.E. <br />County Engineer <br />FROM: Michelle A. Terry, C.E.T. <br />Civil Engineer <br />SUBJECT: 38th Court Paving from 45th Street to 47th Street <br />DATE: January 16, 1989 <br />Descriptions and Conditions <br />As part of the Gifford Sewer Project the existing sewer line <br />on 38th Court is to be rehabilitated. However, paving of <br />this road was not made part of the original contract. <br />There is money in an escrow account (FHA) Farmers Home <br />Administration in the Florida National Bank of Vero Beach <br />for paving improvements to 38th Court. <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.