My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/7/1989
CBCC
>
Meetings
>
1980's
>
1989
>
3/7/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:46:33 AM
Creation date
6/12/2015 2:43:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/07/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Bowman pointed out that a mathematical error <br />was made in multiplying 592 linear feet by $7.28. The amount of <br />the bid should be $4,309.76 instead of $4,314.57, and the amount <br />to be transferred from the Operating funds should be $309.76 <br />instead of $314.57. <br />General Services Director Sonny Dean explained that these <br />were the contractor's figures, but the Commissioners felt very <br />strongly that someone should check the figures when they are <br />received. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Scurlock, the Board unanimously awarded <br />IRC Bid #89-46 to the single bidder Adron Fence in the <br />form of a fixed contract in the amount of $4,309.76, <br />and authorized the transfer of $309.76 from the <br />Operating funds to accommodate the deficit. <br />J. IRC Bid #89-50, Fertilizer 15-5-15 <br />The Board reviewed the following memo dated 3/2/89: <br />DATE: March 2, 1989 <br />TD: Board of County Coatmissioners <br />TWTJ: James E. Chandler, County '•' •.strator <br />H.T. "Sonny" Dean, Director, <br />Department of General S <br />FIa :_.Dominick L. Mascola, CPO Manager <br />Division of Purchasing <br />EMT: IRC Bid No. 89-50 <br />Fertilizer 15-5-15 <br />BAC[CG OUND <br />The subject bid for Sandridge Golf Course was properly advertised <br />and ten (10) invitations were sent out. On March 1, 1989 bids were <br />received. Seven (7) contractors submitted proposals for the project. <br />9 <br />41999 <br />LIAR 1 BOOK f • .c <br />
The URL can be used to link to this page
Your browser does not support the video tag.