Laserfiche WebLink
Alternatives and Analysis: <br />Work Order #4 issued under the Master Agreement between Indian <br />River County and Lloyd and Associates includes Lots 4 through 8 <br />of Block 28. <br />This is required to complete the Site Plan for the Main Library, <br />and is required by Dow, Howell, Gilmore, library architects. <br />Recommendation: <br />Staff remommends approval of Work Order #4 (in the amount of <br />$1375.00, previously signed by Lloyd) for survey and <br />topographical drawings as outlined in the agreement. <br />Funding is available in account # 322-109-571-033.13 in the <br />Main Library Construction Fund. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Eggert, the Board unanimously approved Work <br />Order #4 to Master Agreement w/Lloyd & Assoc. as <br />described above. <br />INDIAN RIVER COUNTY <br />MAIN LIBRARY SITE BOUNDARY SURVEY <br />WORK ORDER NO. 4 TO THE PROFESSIONAL CIVIL <br />ENGINEERING/LAND SURVEYING SERVICES MASTER AGREEMENT <br />BETWEEN LLOYD AND ASSOCIATES, INC., DATED 6-21-88 <br />AND INDIAN RIVER COUNTY, FLORIDA. <br />Pursuant to the Professional Civil Engineering/Land <br />Surveying Services agreement dated 6-21-88, by and between <br />Indian River County, a political subdivision of the State of <br />Florida, hereinafter referred to as the COUNTY, and Lloyd & <br />Associates, Inc., Vero Beach, Florida, hereinafter referred to as <br />ENGINEER, this Work Order No. 4 is an extension of and hereby <br />becomes a part of the master agreement (hereinafter referred to <br />as the MASTER AGREEMENT) as folloOs: <br />Section I - Project Limits <br />1) LOTS 4 through 8 BLOCK 28 ORIGINAL TOWN. <br />Section II - County Obligations <br />The COUNTY agrees to: <br />A. Provide the ENGINEER with all available drawings, <br />surveys, right-of-way maps, and other documents pertinent to the <br />project which are in the posession of the COUNTY; however, all <br />information requiring research shall be the responsibility of the <br />ENGINEER. <br />Section III - Scope of Work <br />A. ENGINEER shall provide boundary survey, above and <br />below grade as-builts including all buildings and utility lines <br />15 <br />tiAR 21 089 <br />BOOK76 fAGE 407 <br />