My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/21/1989
CBCC
>
Meetings
>
1980's
>
1989
>
3/21/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:44:02 AM
Creation date
6/12/2015 2:44:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/21/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 21 1989 <br />EtooK 76 F .,E 408 <br />and tree locations, topographic survey. In accordance with the <br />provisions of Chapter 21 HH -6 F.A.C., as per architects <br />instructions, Exhibit A. <br />B. The ENGINEER will strive to complete his work on the <br />project within t•he time allowed by maintaining an adequate staff <br />of registered surveyors, draftsmen and other employees on the <br />work at all times. <br />Section IV - Time for Completion <br />A. After issuance of written authorization to proceed, <br />fifteen (15) working days will be allowed to delivery of the <br />plans. <br />Section V - Compensation <br />A. The COUNTY 'agrees to pay, and the ENGINEER agrees to <br />accept for services rendered pursuant to this agreement, fees in <br />accordance with the following: <br />B. Survey and drawing costs as proposed within agreement <br />shall be a lump sum cost of 1,375.00 . This fee is based on <br />surveyors estimate and will be due upon completion. <br />C. Additional survey and drafting work which may be <br />required for off-site parking will be billed as additional <br />charges. <br />Section VI - Additional1Work <br />In the event changes are requested by the County or extra <br />work is imposed on the COUNTY by the demands of certain <br />regulatory agencies after the approval by the COUNTY of this <br />agreement, and upon the issuance of a subsequent work order, by <br />the Director of Public Works Department, said extra work may <br />commence in accordance with the following fee schedule: <br />LLOYD AND ASSOCIATES, INC. <br />RATE SCHEDULE <br />ENGINEER $45.00/hr. <br />ENGINEERING DESIGNER $35.00/hr. <br />SURVEY MEN (3 MEN) $60.00/hr. <br />DRAFTING $25.00/hr. <br />SECRETARY $25.00/hr. <br />CONSTRUCTION INSPECTOR $27.00/hr. <br />FEES Cost +10% <br />MATERIALS Cost <br />TRAVEL $per Florida <br />Statutes <br />The ENGINEER certifies that the following wage rates and other <br />factual unit costs supporting the compensation are accurate, <br />supporting, complete, and current at the time of contracting. <br />Section VII - Partial Payments <br />Due to the short-term nature of the work,.. only one payment <br />will be ,made according to the conditions stated in Section V. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.