My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/18/1989
CBCC
>
Meetings
>
1980's
>
1989
>
4/18/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:49:20 AM
Creation date
6/12/2015 2:46:44 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/18/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Bowman, SECONDED by Com- <br />missioner Bird, the Board unanimously authorized the <br />Chairman to execute the Project Agreement for the <br />Sebastian Main Street Boat Dock Replacement as recom- <br />mended by staff. <br />COPY OF PARTIALLY SIGNED AGREEMENT IS ON FILE IN THE OFFICE <br />OF CLERK TO THE BOARD. <br />PETITION PAVING - PROJECT SCHEDULING & COSTS TO ACCELERATE PAVING <br />The Board reviewed memo from Public Works Director Davis: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E., <br />Public Works Director <br />SUBJECT: Petition Paving Program - Project Scheduling and Costs <br />to Accelerate Paving <br />DATE: April 11, 1989 <br />DESCRIPTION AND CONDITIONS <br />In the past few years, the petition paving program has seen <br />an increase in voluntary petitions for paving of local roads. In <br />addition, two large Petition Projects, Dixie Heights Subdivision <br />and Florida Ridge Subdivision (8.3 miles of roads), are currently <br />under construction/design and these large projects are time <br />consuming to implement. To accommodate the increased requests <br />for paving, staff has investigated alternatives to accelerate the <br />surveying, engineering design, preparation of assessment rolls, <br />public hearing notification and advertisement, stormwater <br />permitting, construction stake -out, utility sleeve installation, <br />-and final construction of the following projects currently on the <br />petition paving list: <br />Project# Description Length Est.Const.Cost Valid <br />($23.70/LF)** Petition <br />8610 Floral Park & Ranch Est. S/D. * 4,955 LF .$117,433 yes <br />8627 Granada Gardens 1,860 LF 44,082 no <br />llth St/lith Pl/Madrid Ave. <br />8639 84th St - Old Dixie to US1 570 LF 13,509 no <br />8640 83rd Pl.-Old Dixie to US 1 660 LF 15,642 no <br />8641 Tropical Ave. -Old Dixie to US 1 370 LF 8,769 no <br />8702 10th Ct. SW north of Oslo Rd. 1,298.5 LF 30,774 no <br />8705 42nd Avenue -8th St to 6th St.* 1,312 LF 31,094 yes <br />8706 8th Ave. -South of 2nd St. * 385 LF 9,125 yes <br />8707 13th Ave. -12th St. to 14th St. 1,316 LF 31,190 yes <br />8708 9th Ave. - South of 2nd St.* 568 LF 13,462 yes <br />APR 18 1989 <br />57 <br />fkOOK 76 FME 646 <br />
The URL can be used to link to this page
Your browser does not support the video tag.